Similar Projects
Replace MEP Systems at Lecture Center at SUNY New Paltz
Post-Bid
New Paltz, NY 12561

OSC Cooling Tower Replacement
Term Contract
Post-Bid
Lake Placid, NY 12946

Foley AC-1 Replacement Project
Results
Albany, NY 12207

HVAC Equipment_Service and Preventative Maintenance Contract
Results
Buffalo, NY 14207

New Climate Control System-West Haverstraw Village Community Center Gymnasium
Post-Bid
West Haverstraw, NY 10993

J--HVAC Cleaning of Wards 5C and 9A (VA-19-00018526)
Results
Buffalo, NY NY

HVAC Project
Post-Bid
Mechanicville, NY 12118

Campus Center AC-2 Upgrade
Results
Albany, NY

FAB Heating Upgrade
Post-Bid
New Paltz, NY 12561

J--Batavia Boiler Plant Work (Va-19-00027248)
Results
Batavia, NY 14020

Heating, Ventilating and Air Conditioning (HVAC) Contractors
Term Contract
Post-Bid
Fishkill, NY 461052

Rotary Forge & Cooling Towers
Results
Watervliet, NY 12189

NextGen HVAC Technology Challenge
Term Contract
Post-Bid
Albany, NY 12203

Duct Work Cleaning at Building 25
Results
Watervliet, NY 12189

Maintenance and Repair of HVAC
Post-Bid
NY

Last Updated 11/09/2020 01:54 PM
Project Title

HVAC Replacements

Physical Address View project details and contacts
City, State (County) Scotia, NY   (Schenectady County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of the removal, disposal and replacement of two R-410A roof top units - One 40 ton unit is required for the Building 16 Dining Facility and one 12.5 ton unit is required for Building 25 Civil Engineering. Building 16 Dining Facility: Contractor will install one new rooftop unit (RTU). Unit shall be a York model number RZ4N852ABE, or equal, with 4 stages, a total 40 ton cooling capacity and 800,000 BTU input heating capacity. Energy Efficiency Ratio (EER) shall be a minimum of 10.7. Unit will be 208 voltage 3 phase. Building 25 Civil Engineering Squadron: Contractor will install one new RTU. Unit shall be a Bryant model number 580JP14D224A, or equal, with 2 stages, a total of 12.5 ton cooling capacity and 150,000 BTU input heating capacity. EER shall be a minimum of 10.8. Unit will be 208 voltage 3 phase. Previous unit in this location was a cooling unit only. New unit is both cooling and heating. Installation will require connection to a nearby gas line, approximately 10 feet away.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents