Similar Projects
Harlem Baden Phase 3
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Saint Louis, MO 63114

Jefferson Barracks Sanitary Sewer Connection Project - Department of Parks and Recreation
Infrastructure
Bidding
$300,000 est. value
Bella Villa, MO 63125

Electrical Submersible Dewatering Pumps
Post-Bid
Saint Louis, MO

Clayton Meramec Elementary Private I/I Removal (South Meramec Avenue at Walinca Ter)
Post-Bid
$180,000 est. value
Clayton, MO 63105

Park Drive Sanitary Relief (Engelholm Avenue) Phase II
Results
$1,394,000 est. value
Greendale, Normandy, Pagedale, MO

Shrewsbury Sanitary Relief Sewer and I/I Reduction (Weil Ave and I-44
Results
$980,000 est. value
Saint Louis, MO

1/2 Hp Cast Iron Pump
Term Contract
Post-Bid
Saint Louis, MO

Maplewood-Blendon Combined Sewer Relief Phase I
Infrastructure
Results
$85,000 est. value
Maplewood, MO 63143

Lemay Public I/I Reduction and Rehabilitation (2022)
Infrastructure
Post-Bid
Less than $3,785,000 est. value
Maplewood, Richmond Heights, Shrewsbury, Webster Groves, MO

Washington Terrace 14 Sewer Replacement
Infrastructure
Results
$259,000 est. value
Saint Louis, MO 63100

Sub-Trunk #2 Sanitary Relief (Birmingham Ct To Cove Ln)
Alteration
Post-Bid
Less than $2,419,500 est. value
Saint Louis, MO

Geyer Sanitary Relief and Windsor Springs P-521 Storage Big Bend Boulevard to Windsor Spring
Infrastructure
Results
Saint Louis, MO

Inline Pump
Infrastructure
Post-Bid
Saint Louis, MO

Canterbury and Roland Sanitary Relief
Infrastructure
Results
Northwoods, MO 63121

Pump and Related Equipment Repair, Maintenance and Parts - MDC
Term Contract
Post-Bid

Last Updated 07/06/2022 08:44 AM
Project Title

Earth City UPS Pump Station (P-702) Replacement Phase II

Physical Address View project details and contacts
City, State (County) Earth City, MO 63044   (Saint Louis County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of Pump Station P-702, the construction of approximately 150 lineal feet of 8" force main, and the construction of approximately 51 lineal feet of pipe sanitary sewers, varying in size from 8" to 72" in diameter.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents