Similar Projects
Davinci Academy - Suites D, E, & F
Renovation - 3,814 SF
Post-Bid
Kaysville, UT 84037

Premier Martial Arts
Renovation - 1,544 SF
Post-Bid
Pleasant Grove, UT 84062

Bernie Summer Camp Activities Center & Outdoor Athletic Complex
New Construction - 9,300 SF
Construction
$4,500,000 est. value
Salt Lake City, UT 84113

Logan High School Athletics Remodel
Post-Bid
Logan, UT 84321

Rocky Mountain Tumbling and Cheer
New Construction
Pending Verification
Clearfield, UT

Dumke Gymnastics Expansion and Renovation
Renovation, Addition - 1,000 SF
Results
$2,641,000 est. value
Salt Lake City, UT 84112

Goldfish Swim School
Renovation - 9,341 SF
Post-Bid
Salt Lake City, UT 84109

American Heritage Phase 1C And 2A
New Construction - 86,128 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
American Fork, UT 84003

Reach Higher Performance Center
New Construction - 28,783 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Saint George, UT 84770

Hillside Estates
New Construction - 4,775 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Clearfield, UT

Eagleridge Tennis Club
Addition
Pending Verification
North Salt Lake, UT

Reported 01/27/2021 12:00 AM
Project Title

Logan High School Athletic Fields Track Replacement

Physical Address View project details and contacts
City, State (County) Logan, Providence, UT 84321   (Cache County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The demolition of the existing asphalt track and surface and replace it, using the same "footprint", and install a new post-tension concrete track system. Demolition of the existing asphalt track, sub-base material and rough site preparation / grading. The selected track contractor will be required to furnish all labor, materials, supervision, tools, equipment, and transportation and to perform all work for the design, final site preparation, construction, and completion of the new post-tensioned concrete track system, including surfacing membrane system. The project site located on the campus of Logan High School: 1. Logan High School address: 162 West 100 South - Logan, Utah 84321. 2. Access to the athletic fields is approximately 150 West 300 South Logan, Utah 84321.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents