Similar Projects
Air Rescue Firefighting Facility
New Construction
Conception
Saint Paul, MN

Woodlane Park & Ride Gold Line Station Parking Ramp - Metro Transit
New Construction, Infrastructure - 170,850 SF
Conception
$114,800,000 CJ est. value
Woodbury, MN 55125

RFP Design - Architectural/Engineering and Construction Administration Services
New Construction, Infrastructure
Design
$3,900,000 CJ est. value
Lowry, MN 56349

Blaine Human Service Center 2nd and 4th Floor Remodel
Build-out
Bidding
$600,000 CJ est. value
Blaine, MN 55434

Solar PV Carport Systems Installation
New Construction
Post-Bid
Winona, MN

Transit Shelters
New Construction
Post-Bid
Burnsville, MN

Winona Bus Shelter Installation
New Construction
Results
$72,349 est. value
Winona, MN

Brine Building Albert Lea Truck Station - General Construction
New Construction
Results
$332,000 est. value
Albert Lea, MN 56007

Metro Gold Line Bus Rapid Transit (GBRT)
New Construction, Infrastructure
Construction
$247,954,230 CJ est. value
Saint Paul, MN 55101

Metro Gold Line Bus Rapid Transit (GBRT)
New Construction, Infrastructure
Construction
$247,954,230 CJ est. value
Saint Paul, MN 55101

Building Controls System
Renovation
Post-Bid
$2,000,000 CJ est. value
Duluth, MN 55802

Brine Building Fairmont Truck Station - General Construction
New Construction
Results
$332,000 est. value
Fairmont, MN 56031

Site Construction and Control Building
New Construction, Infrastructure
Results
Rochester, MN

District Services Center, Transportation, Public Roadway
New Construction
Results
$16,736,000 est. value
Duluth, MN 55811

Bus Barn
New Construction - 10,120 SF
Results
McGregor, MN

Last Updated 12/12/2022 12:08 AM
Project Title

Heywood Interior Garage Door and Fuel Piping Added Bracing

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55411   (Hennepin County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $201,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project includes structural modifications to install a new wall for a garage door opening, installation of a new door, and installing and sequencing controls with the existing door to create a vestibule system. The work will also add structural metal framing to support fuel system shear valves in the fueling area to protect against large fuel spills if an accident occurs.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Windows.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents