Similar Projects
Bio - Chemistry Chillers Replacement HVAC Controls - Ohio University
Renovation, Alteration
Conception
$2,000,000 est. value
Athens, OH 45701

Repair HVAC Squadron Operation Bldg 146
Renovation
Sub-Bidding
$5,000,000 CJ est. value
Springfield, OH 45502

Record Center Boiler Replacement
Renovation
Sub-Bidding
$65,000 CJ est. value
Hamilton, OH 45011

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Public Auditorium Music Hall Air Handling Units
Results
$950,000 est. value
Cleveland, OH 44114

Nagel MS Cooling Tower Replacement
Results
Cincinnati, OH

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Scioto Ridge Elementary School Chiller Replacement
Results
Powell, OH 43065

Replacement of Chillers #2 and #3 at DFAS
Term Contract
Post-Bid
Columbus, Whitehall, OH 43213

Industrial Air Quality Testing Services
Results
Bratenahl, Cleveland, OH 44199

Cellulose Insulation, Construction Materials, And Residential Electrical, Plumbing And Heating Related Services
Term Contract
Post-Bid

HVAC Maintenance
Results
$244,163 est. value
Strongsville, OH

HVAC Services for Campus
Alteration
Post-Bid
Cincinnati, OH

Y1da--Add AHU Metering Louis Stokes VAMC
Results
$1,000,000 to $5,000,000 est. value
Cleveland, OH 44106

Last Updated 09/22/2022 11:33 PM
Project Title

Clear Fork Middle/High School HVAC Improvements

Physical Address View project details and contacts
City, State (County) Bellville, OH 44813   (Richland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of all labor, materials, and services necessary for the timely and proper completion of scope of work outlined in Bid Package for the Clear Fork Middle/High School HVAC Improvements ("The Project"), all in accordance with the Contract Documents. Bidder shall furnish a Bid Guaranty, as prescribed in Sections 153.54, 153.57, and 153.571 of the Ohio Revised Code, in the form of either: (1) a bond for the full amount of the bid in the form of the Bid Guaranty and Performance Bond included in the Contract Documents; or (2) a certified check, cashier's check, or irrevocable letter of credit in an amount equal to 10% of the bid. The bid amount shall be the total of all sums of the bid including all add alternates but excluding all deduct alternatesThe Board of Education reserves the right to reject any, or part of any, or all of said proposals. Successful bidder/s shall be required to furnish bonds in the amount of one hundred percent (100%) of the contract/s for both performance and labor and materials. SCOPE OF WORK A. Work includes, but is not limited to: 1. Furnish and install new rooftop units. 2. Coordinate new equipment structural sizes and locations for all new equipment. 3. Furnish and install all required condensate, equipment and drain piping. 4. Furnish and install duct insulation. 5. Furnish and install new instruments as shown. 6. Furnish and install new ductwork. 7. Furnish and install air balancing. 8. Perform final setting and leveling of all new equipment. 9. Perform start-up for all HVAC systems and commission same in accordance with the commissioning requirement. 10. Provide and/or participate in training of Owner's personnel on the use of all new HVAC systems. 11. Refer to drawings for Schedules of HVAC Equipment. 12. The contractor shall exercise adequate protective and safety measures for all persons and property and shall be responsible for any damages or injuries arising from the execution of this work. 13. Alterations and additions to existing work shall include the requisite dismantling of the old equipment, rigging, wrecking, hauling, protections of permanent equipment and the building structures, and cleaning up. Care shall be exercised to keep dust and dirt to a minimum and to confine it to the area where the removal work is being performed. All debris shall be promptly removed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents