Similar Projects
HVAC Subcontractor Colorado Springs
Term Contract
Sub-Bidding
Colorado Springs, CO 80903

Outside RA HVAC Maintenance
Term Contract
Post-Bid
Colorado Springs, CO

Pioneers Museum HVAC System Installation
Alteration
Post-Bid
Colorado Springs, CO 80903

Remove and Install Air Handling Units at Sheriff`s Office
Alteration
Results
Colorado Springs, CO 80903

CM Engineering Building VAV Replace and Control Upgrade
Alteration
Results
$1,999,350 est. value
Colorado Springs, CO

B1470 Air Handler Units - Peterson SFB, CO
Term Contract
Post-Bid
Colorado Springs, CO 80902

Air Filters for MA-50 Harrison School District
Alteration
Post-Bid
Colorado Springs, CO 80905

Watson Junior High HVAC Renovation
Alteration
Post-Bid
Colorado Springs, CO 80911

Replace HVAC System #49 Replace Water Soft #118
Alteration
Post-Bid

Pioneers Museum Renovation & HVAC System Rebuild
Alteration
Post-Bid
Colorado Springs, CO

Grant Elementary School HVAC Replacement
Renovation
Post-Bid
$500,000 CJ est. value
Colorado Springs, CO 80918

HVAC Air Purification System Transit Administration Building
Renovation
Post-Bid
$70,000 CJ est. value
Colorado Springs, CO 80903

Additional Filters for MA-50 Harrison School District
Alteration
Post-Bid
Colorado Springs, CO

Sheriff's Office Fleet HVAC Upgrades
Renovation
Post-Bid
$70,000 CJ est. value
Colorado Springs, CO 80906

FNS WI Freezer Replacement, New WI Cooler
Renovation
Post-Bid
$200,000 CJ est. value
Colorado Springs, CO 80915

Last Updated 05/10/2023 04:15 PM
Project Title

Jenkins MS HVAC Replacement

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80923   (El Paso County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2024
Bids Due View project details and contacts
Estimated Value $270,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Colorado Springs School District 11 is requesting proposals from Contractors to replace the HVAC system at Jenkins Middle School. Questions Due Date: May 1st 2023, 12:00 PM MDT B.1 GENERAL The following is presented to describe the general expected vendor performance requirements. Offerors must submit how and when they are capable of supplying the required products and services and completing the work within the required time. Offerors are free to suggest other product(s) brands and models, work service procedures, or project approaches, designs, or exceptions to this general scope of work. Those exceptions must be clearly (bold, underlined, etc.) indicated in your offer. If an Offeror cannot perform as described or takes exception to any element, those exceptions must be fully described in their Offer and an alternate plan or approach presented. Award will not be based on price alone. Clean-Up Contractor shall keep the premises free from accumulation of debris, surplus material, waste material, dirt piles and rubbish caused by the work. Contractor shall perform clean-up daily and transport rubbish to an on-site location designated by Contractor. Contractor is responsible for containment and removal. The Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any surplus materials that are not the property of the District. Upon completing the work, the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer and shall remove surplus material, waste material, and dirt and rubbish, tools, equipment and scaffolding. A. Final Clean-Up: 1. Exterior: In addition to items specified below, all surfaces on exterior, concrete, metal, etc., affected by the work shall be carefully and thoroughly cleaned. 2. Glass: Both sides of all glass affected by the work shall be carefully and thoroughly cleaned by professional window cleaners and left absolutely clean and free from paint, labels, grease, dirt, etc. 3. Hardware: Clean and polish all hardware affected by the work and leave cleanand free from paint, grease, dirt, etc. 4. Equipment: Carefully and thoroughly clean all items or equipment, mechanical, electrical, cabinets, ductwork, etc., which have been affected by the work. B. All work areas within the area of responsibility shall be left in clean condition before being accepted by the District. The Contractor shall be required to clean only those areas which are affected by the work. It is anticipated that this will be limited to the work areas indicated on the plans, areas adjacent to the work areas which are affected by the work, the areas on the site where the Contractor's trailer(s) are located, and any other interior or exterior areas which have been dirtied or damaged by the Contractor's operations under this contract. C. Any damage caused by the Contractor shall be accomplished within the period of performance of the Contract. No extension of time will be granted to completerepair

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents