Similar Projects
Global Learning Charter Public School Renovations
Renovation
Conception
New Bedford, MA 02746

Sale and Development of the Former Rogers Elementary School
Post-Bid
Fairhaven, MA 02719

South School Miscellaneous Repairs
Post-Bid
Raynham, MA

Westport Middle-High School - Filed Sub Bid
Results
$74,000,000 to $75,000,000 est. value
Westport, MA

Bristol County Agricultural High School Project
Results
$84,000,000 est. value
Dighton, MA 02715

BMC Durfee High School Project - RFQ 3 For Trade Contractors
Construction
Less than $217,000,000 est. value
Fall River, MA 02720

Argosy Collegiate Charter School
Addition - 58,219 SF
Construction
Fall River, MA 02721

On-Call OPM Services
Renovation, Term Contract
Post-Bid
New Bedford, MA

BMC Durfee High School Bid Package 5
- 501,330 SF
Results
$217,000,000 est. value
Fall River, MA 02720

Alma Del Mar II School Project
New Construction - 51,000 SF
Construction
Less than $18,000,000 est. value
New Bedford, MA 02745

Project Management Services for the Design, Construction, Demolition, Addition to And/or Renovation of the Bristol-Plymouth Regional Technical School
Results
$100,000,000 to $250,000,000 est. value
Taunton, MA 02780

Attleboro High School - Bid Package 4 - Main Building
New Construction
Results
Attleboro, MA 02703

Owner’s Project Management Services for the Central Kitchen
Results
Less than $3,000,000 est. value
New Bedford, MA 02740

Disposition and Development - Former Dunbar School
Results
New Bedford, MA

Roof and Boiler Replacement for the Resiliency Preparatory School - General Bid
Results
Less than $4,900,000 est. value
Fall River, MA 02720

Reported 05/28/2020 12:00 AM
Project Title

New Performing Art Center Addition at the Southeastern Regional Vocational Technical High School

Physical Address View project details and contacts
City, State (County) South Easton, MA   (Bristol County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $8,000,000
Plans Available from Consultant - 05/13/20
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. Prequalify General Contractors for the construction of a new Performing Art Center addition at the Southeastern Regional Vocational Technical High School in Easton. The project scope includes the construction of a new 280 seat theater and supporting spaces that is approximately 10,000 square feet. The estimated construction cost is $8,000,000. Construction is to begin in Fall of 2020 and be completed in Fall of 2021.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents