Similar Projects
MMHI-21-11 Powerplant Chiller Repair and Service
Term Contract
Post-Bid
Less than $50,000 est. value
Madison, WI 53704

Refrigerant Monitoring System Replacement
Post-Bid
Less than $150,000 est. value
Madison, WI

Utility Renovations - Mechanical
Results
Less than $3,000,000 est. value
Madison, WI 53703

Heim Building AC Replacement
Results
Madison, WI 53713

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Improvements
Results
$203,000 est. value
Madison, WI

NWHC Replacement of Air Handling Unit - FS-06
Post-Bid
Madison, WI

Air Handling Units Replacement
Results
$210,000 est. value
Madison, WI

Supply, Delivery and Incidental Install of LP Gas Heated Pressure Washers for the Nine Federal Flood Risk Management Structures (Fox River Dams), Wisconsin
Post-Bid

HVAC Annual Preventative Maintenance
Results
Madison, WI 53704

Heating Systems Repair/Replace, Clean & Tune
Alteration
Post-Bid

BPHCC HVAC RTU Modifications
Alteration
Results
Verona, WI 53593

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Food Service HVAC Improvements - MEP
Alteration
Results
$1,675,000 est. value
Madison, WI

MEPF Design Assist for East, West and Capital High Schools
Alteration
Post-Bid
Madison, WI 53704

Last Updated 03/10/2022 01:20 PM
Project Title

Building One And Four Air Conditioning Installation MEP

Physical Address View project details and contacts
City, State (County) Madison, WI 53704   (Dane County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of ductless mini-spit air conditioning systems and a energy recovery systems that provide code required ventilation air for Buildings One and Four. Electrical system is being upgraded with two new 200 amp breakers at existing switchgear to feed new Building One and Four 200 amp 208/120 3 phase panel. New panels will support addition of new Mechanical equipement and existing building electrical panels. Buildings One & Four have approximately 5,300 square feet of occupiable space that wil be used as offices, with an attic and a crawl space below.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents