Project Title | West Orange County and Lower Feeder Blow-off Drain Line Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Buena Park, CA 90621 (Orange County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $163,580 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of rehabilitating approximately 60 linear feet of 18-inch corrugated metal drain line with CIPP located at two project sites, temporary traffic control, excavating pipe access pits, surface restoration, and all other work as shown on the drawings. Estimated Bid Value $175,000 to $225,000 Project Duration 200 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 06/23/2022 11:59 PM (PDT) Failure to Complete Work: Liquidated damages provided for by Section 30 of Document 00700, General Conditions, are fixed at $400 per calendar day if the Contractor fails to complete all the work included in the Contract within the time specified. Metropolitan has adopted a policy encouraging the participation of Small Business Enterprise and Disabled Veteran Business Enterprise (SBE/DVBE) firms in its contracts. For this project, Metropolitan requires small and/or disabled veteran business participation of at least 25 percent of the total bid. Failure to meet this percentage will cause Metropolitan to reject the bid as non-responsive. SBE/DVBE participation will be determined by the total value of all contracts entered into with SBEs and DVBEs for this project. Bidders may call Metropolitan's Business Outreach Officer at (213) 217-7444 with questions regarding the Small/Disabled Veteran Business Enterprise Program. A. The Contractor shall begin work within 30 calendar days after receipt by the Contractor of the Notice to Proceed and shall complete all the work included in the Contract within 200 working days after the date of receipt of the Notice to Proceed (NTP). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |