Similar Projects
Parkview Place - Phase 2
New Construction
Conception
Sanford, FL

STEM Building B - Seminole State College
New Construction, Infrastructure - 111,775 SF
Conception
$48,564,418 CJ est. value
Altamonte Springs, FL 32714

Former Flea World Redevelopment
New Construction - 2,400,000 SF
Design
Sanford, FL 32773

Former Flea World Redevelopment
New Construction - 2,400,000 SF
Design
Sanford, FL 32773

Seminole Fire Station No. 39
New Construction, Infrastructure - 12,920 SF
Post-Bid
$8,000,000 CJ est. value
Sanford, FL 32771

WMG Sanford Commercial - Sitework
Infrastructure
Post-Bid
Sanford, FL 32771

Seminole County Fire Station Asphalt Replacement
Results
Geneva, Winter Park, FL 32732

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Grand View at Lake Wildmere - Phase 2 Unit #1000 - 3000
New Construction - 72,200 SF
Construction
Longwood, FL 32750

The Ellington at Oviedo Park
New Construction - 350,045 SF
Construction
Oviedo, FL 32765

El Dorado Furniture / Altamonte Springs
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Altamonte Springs, FL 32701

Oviedo Mall Redevelopment
Demolition, New Construction, Infrastructure - 128,850 SF
Pending Verification
$150,000,000 CJ est. value
Oviedo, FL 32765

3000 Celery
New Construction, Infrastructure
Conception
$5,000,000 est. value
Sanford, FL 32771

Seminole Springs Retirement Community
New Construction - 175,250 SF
Design
$21,000,000 est. value
Sanford, FL 32771

Construction of Sunrail Station Bicycle and Pedestrian Connectivity Improvements
Infrastructure
Post-Bid
$8,900,000 est. value
Altamonte Springs, FL

Last Updated 12/06/2022 01:49 PM
Project Title

Kentucky Square

Physical Address View project details and contacts
City, State (County) Sanford, FL 32773   (Seminole County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Single-Family Homes, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $58,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of single family homes ranging from 1,700-3,330 square feet and a community pool on 40 acres. Scope details have not been released. As of July 28, 2022 the project is in planning stage. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the first quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents