Similar Projects
Last Updated | 07/08/2020 10:21 AM |
Project Title | Bridge Replacement BR No W-28-017 (Next D Beams) Route 12 (Ashburnham Road) over Phillips Brook |
Physical Address | View project details and contacts |
City, State (County) | Westminster, MA 01473 (Worcester County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,809,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | "1.000","Ls","Schedule Of Operations - Fixed Price $14,500","100." "1.000","a","Clearing And Grubbing","101." "1.000","Ls","Tree Trimming","102.2" "8.000","Hr","Control Of Invasive Plants Existing On Site","102.3" "8.000","Hr","Invasive Plant Management Strategy","102.33" "630.000","Ft","Tree And Plant Protective Fence","102.521" "1.000","Ls","Demolition Of Superstructure Of Bridge No. w-28-017 (b1e)","114.1" "1.000","Ls","Rodent Control","119." "1300.000","Cy","Unclassified Excavation","120.1" "40.000","Cy","Concrete Excavation","127." "35.000","Cy","Reinforced Concrete Excavation","127.1" "490.000","Cy","Bridge Excavation","140." "50.000","Cy","Test Pit For Exploration","141.1" "300.000","Cy","Class b Trench Excavation","142." "100.000","Cy","Class b Rock Excavation","144." "2.000","Ea","Drainage Structure Removed","146." "450.000","Cy","Ordinary Borrow","150." "500.000","Cy","Gravel Borrow","151." "200.000","Cy","Gravel Borrow For Bridge Foundation","151.1" "60.000","Cy","Gravel Borrow For Backfilling Structures And Pipes","151.2" "20.000","Cy","Controlled Density Fill - Non-Excavatable","153.1" "160.000","Ton","Crushed Stone","156." "48.000","Ton","Crushed Stone For Integral Abutments","156.13" "3000.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "1.000","Ls","Environmental Health And Safety Program","180.01" "140.000","Hr","Personal Protection Level c Upgrade","180.02" "1.000","Ea","Catch Basin","201." "4.000","Ea","Catch Basin - Deep Sump","201.4" "5.000","Ea","Large Hook Lock Bar Grate – Furnished And Installed","222.4" "2.000","Cy","Removal Of Drainage Structure Sediment","227.3" "50.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "170.000","Ft","12 Inch Reinforced Concrete Pipe","241.12" "5.000","Ea","12 Inch Reinforced Concrete Pipe Flared End","242.12" "25.000","Sy","Stone For Pipe Ends","258." "325.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "1350.000","Sy","Pavement Micro Milling","415.3" "14000.000","Lb","Calcium Chloride For Roadway Dust Control","440." "3.000","Mgl","Water For Roadway Dust Control","443." "450.000","Ton","Superpave Surface Course - 12.5 (Ssc - 12.5)","450.23" "550.000","Ton","Superpave Intermediate Course - 19.0 (Sic - 19.0)","450.32" "700.000","Ton","Superpave Base Course - 37.5 (Sbc - 37.5)","450.42" "27.000","Ton","Superpave Bridge Surface Course - 9.5 (Ssc-b - 9.5)","450.60" "27.000","Ton","Superpave Bridge Protective Course - 9.5 (Spc-b - 9.5)","450.70" "500.000","Gal","Asphalt Emulsion For Tack Coat","452." "3000.000","Ft","Hma Joint Sealant","453." "420.000","Ft","Hot Mix Asphalt Berm, Type a - Modified","470.2" "20.000","Ton","Asphalt Mixtures For Temporary Work","472." "2100.000","Ft","Sawcutting Asphalt Pavement For Box Widening","482.5" "100.000","Ft","Granite Curb Type Va5 - Straight","505." "15.000","Ft","Curb Removed And Discarded","594." "800.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "50.000","Ft","Guardrail - Curved, Tl-3 (Single Faced)","620.33" "1.000","Ea","Steel w Beam Terminal Section (Single Faced)","627.1" "4.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "1.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "4.000","Ea","Transition To Bridge Rail","628.24" "900.000","Ft","Highway Guard Removed And Discarded","630.2" "200.000","Ft","Temporary Fence","657." "400.000","Ft","Temporary Fence Removed And Reset","657.5" "600.000","Ft","Chain Link Fence Removed And Stacked","665." "200.000","Ft","Fence Removed & Disposed","669.1" "2.000","Ea","Silt Sack","697.1" "290.000","Ft","Turbidity Barrier","697.3" "100.000","Sy","Geotextile Fabric For Separation","698.3" "40.000","Sy","Geotextile Fabric For Permanent Erosion Control","698.4" "50.000","Ton","Hot Mix Asphalt Driveway","703." "1.000","Ea","Rural Mail Box Removed And Reset","715." "26.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "160.000","Cy","Loam Borrow","751." "160.000","Cy","Topsoil Rehandled And Spread","751.62" "1.000","Ls","Inland Wetland Replication And Restoration Areas","755.666" "40.000","Hr","Wetland Specialist","755.75" "1.000","Ls","Wetland Monitoring Reports","755.76" "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "2200.000","Sy","Seeding - Low Upland Mix","765.411" "2300.000","Ft","Sediment Control Barrier","767.121" "2200.000","Sy","Straw Mulch","767.31" "900.000","Sy","Jute Mesh Erosion Control Fabric","767.731" "400.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "1.000","Ls","Temporary Traffic Control Signal","816.81" "1.000","Ls","Temporary Traffic Control Signal Removed And Reset","816.83" "30.000","Sf","Warning-Regulatory And Route Marker - Alum. Panel (Type a)","832." "4.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "520.000","Sf","Safety Signing For Traffic Management","852." "4.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "350.000","Ft","Temporary Barrier (Tl-3)-Removed And Reset","853.211" "340.000","Ft","Temporary Barrier Removed And Stacked","853.22" "1.000","Ls","Temporary Traffic Control Devices Removed And Stacked","853.221" "200.000","Ft","Temporary Restrained Barrier With Chain Link Fence","853.25" "105.000","Ft","Temporary Restrained Barrier With Chain Link Fence Removed And Reset","853.251" "1290.000","Ft","Temporary Barrier - Limited Deflection (Tl-3)","853.33" "2.000","Ea","Temporary Impact Attenuator Removed And Reset","853.501" "6.000","Ea","Temporary Impact Attenuator Unidirectional, Redirective (Tl-3)","853.63" "4600.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "4400.000","Sf","Pavement Marking Removal","854.1" "1460.000","Day","Arrow Board","856." "1460.000","Day","Portable Changeable Message Sign","856.12" "120450.000","Day","Reflectorized Drum","859." "2550.000","Ft","6 Inch Reflectorized White Line (Polyurea) (Recessed)","866.206" "20.000","Ft","12 Inch Reflectorized White Line (Polyurea) (Recessed)","866.212" "2650.000","Ft","6 Inch Reflectorized Yellow Line (Polyurea) (Recessed)","867.206" "1.000","Ea","Miscellaneous Signs Removed And Stacked","874.7" "9.000","Ea","Traffic Sign Removed And Discarded","874.8" "2.000","Ea","Sign Post Removed And Stacked","877.2" "845.000","Ft","Steel Pile Hp 12 x 84","942.124" "45.000","Ft","Drilling For Pile Obstructions","945.325" "2.000","Ea","Dynamic Load Test By Contractor","948.41" "16.000","Ea","Pile Shoes","948.5" "360.000","Sf","Temporary Earth Support","950.31" "30.000","Cy","Riprap","983.2" "70.000","Cy","Modified Rockfill","986.2" "1.000","Ls","Control Of Water - Structure No. w-28-017 (b1e)","991.1" "1.000","Ls","Temporary Protective Shielding Bridge No. w-28-017 (b1e)","994.01" "1.000","Ls","Bridge Structure, Bridge No. w-28-017 (b1e)","995.01" |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |