Similar Projects
Underfloor Sewer Replacement at Ferndale Junior-Senior High School
Bidding
$290,000 est. value
Johnstown, PA 15905

Wastewater Collection System
Post-Bid
Cresson, PA 16630

Wastewater System Replacement
Post-Bid
Lorain, PA 15902

Sanitary Sewer Cleaning
Results
Johnstown, PA 15905

Replace Defective Sewer Laterals In Laurel Avenue - Phase 1
Results
Cresson, PA 16630

Clinton Street Interceptor Rehabilitation Project
Post-Bid
Johnstown, PA 15901

Sanitary Sewer Rehabilitation Project Phase I
Results
Johnstown, PA 15901

Wastewater Collection System Extension
Post-Bid
Carrolltown, PA 15722

Sanitary Sewer Rehabilitation Project Phase II
Results
Johnstown, PA 15901

Route 403 PADOT Paving Coordination Manhole Frames and Covers
Post-Bid
Johnstown, PA 15901

Sanitary Sewer Rehabilitation Project
Results
Ebensburg, PA

2020 Pressure Sewer Extension Project
Results
Johnstown, PA 15504

Falls Run Interceptor Manhole Replacement Project
Results
Johnstown, PA 15904

Stormwater Control Measures
Results

Stormwater Installation Project
Results
Ebensburg, PA 15931

Reported 06/16/2020 12:00 AM
Project Title

Lower Yoder Sanitary/Storm Sewer Separation Project Phase III

Physical Address View project details and contacts
City, State (County) Johnstown, PA 15901   (Cambria County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Contract is divided into two (2) project areas, Project Area 1 and Project Area 2. Interested Bidders will submit one bid for both Project Areas. Project Area 1 consists of the rehabilitation of approximately 11,840 linear feet of existing 10 inch sewer line, approximately 2,506 linear feet of existing 12 inch sewer line, and the rehabilitation of approximately 63 sanitary manholes and related work. Project Area 2 consists of the rehabilitation of approximately 1,502 linear feet of existing 8 inch sewer line, approximately 170 linear feet of existing 10 inch sewer line, approximately 4 manholes, and the rehabilitation of approximately 546 linear feet of 4 inch service laterals, and construction of approximately 1,337 linear feet of 4 inch service laterals and related work. Project Area 2 will also include storm sewer work consisting of the construction of approximately 2,235 linear feet of 15 inch storm line, approximately 1,626 linear feet of 18 inch storm line, approximately 28 inlets, and construction of approximately 8 storm manholes and related work.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents