Similar Projects
SCC Flooring Replacement
Alteration
Bidding
Oklahoma City, OK

Gym Floor Replacement for Bid Package 1 - Gym Flooring
Post-Bid
Oktaha, OK

Career Planning Center Interior Flooring Remodel
Alteration
Post-Bid
$45,445 est. value
Oklahoma City, OK 73109

Carpet and Flooring Installation
Results
Oklahoma City, OK

20N 002 Flooring
Term Contract
Results
Oklahoma City, OK 73145

New Flooring and Installation
Alteration
Post-Bid
Oklahoma City, OK

Concrete Floor Project at District 1
Alteration
Results
OK

Library Flooring - Installation
Alteration
Post-Bid
Lindsay, OK 73052

Colvin Center Mac Gym - Indoor Turf and Flooring Replacement
Term Contract
Post-Bid
Stillwater, OK 74074

Keystone New Flooring
Alteration
Post-Bid
Sand Springs, OK

Floor Epoxy
Term Contract
Post-Bid
Oklahoma City, OK 73159

Gym Flooring Replacement
Alteration
Post-Bid
Council Hill, OK

Remove and Replace Carpet - Various County Buildings
Alteration
Post-Bid
OK

Willard Patios Tile Replacement
Alteration
Post-Bid
Stillwater, OK

Flooring Police Courts Building Police Department
Infrastructure
Post-Bid
Tulsa, OK

Reported 11/11/2021 12:00 AM
Project Title

Vance AFB Install Rubber Floor F172

Physical Address View project details and contacts
City, State (County) Enid, OK   (Garfield County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description: ASRC, Arctic Slope Regional Corporation Communications, LTD under the BOS contract FA3002-21-C-0003 is contemplating the issue of solicitation Construct Sidewalk Cover Connecting Facilities. The Contractor shall furnish all supervision, labor, equipment, consumable materials, supplies, tools and other items to complete the construction of listed in the scope of work. All quotes will include all shipping charges for completion of the project. The contractor shall coordinate all work with ASRCC Operations Engineering Office before starting any work. The below list of items are to be considered the general scope of work for this project. The work covered under this statement of work shall consist of the following: Construct a covered structure over existing sidewalks and building steps. Structure should consist of pre-engineered panels for the cover and a structural frame, colored according to The Base Architectural Standards. Clean site to preconstruction conditions or better. The contractor shall provide a standard 1 year contractors warranty for all labor and material from date of the base’s acceptance of completion. Quotes to include not less than prevailing wage labor rate for Garfield County, OK. Proposals must be valid for a minimum of 180 days. Owner reserves the right to reject any bid which does not completely satisfy the scope of work above.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents