Last Updated | 02/11/2022 07:54 AM |
Project Title | Northeast Trail Phase II - Segment II Construction |
Physical Address | View project details and contacts |
City, State (County) | Atlanta, GA (Fulton County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Segment II of construction will consist of connecting the existing trail built by Georgia Power South to Westminster Drive, NE and North to the intersection of Mayson Street, NE and Plasters Avenue, NE. The improvements consist of but are not necessarily limited to the following: • Site demolition and applicable soil haul off as required by drawing specifications • Establishment and maintenance of erosion control per permitted plans throughout the duration of the Project • Grading and construction of stormwater conveyance system per permitted plans • Construction of a multi-use path as outlined in drawings • Lighting and camera installation and subsequent turn over/connection to the Atlanta Police Department (APD) and the City • Construction of ramp connection to Piedmont Avenue • Fiber duct bank installation • Installation of Eco-counters • Bridge enhancements to existing bridges over Clear Creek and the Buford Springs Connector |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |