Similar Projects
I-285/I-20 West Interchange Project
Design
Atlanta, GA 31175

Headland and Delowe Sidewalks
Infrastructure
Bidding
East Point, GA 30364

5.689 Miles of Milling, Inlay and Plant Mix Resurfacing on SR 279 Beginning at the Fayette County Line and Extending South Of Herschel Road
Infrastructure
Bidding
GA

SR 400 Express Lanes
Post-Bid
Less than $13,000,000 est. value

T32 - Routine Maintenance Services - District 7
Term Contract
Post-Bid

Southern Region Disaster Recovery Support BPA
Results

Asphalt Rejuvenation Project
Results
$66,430 est. value
Milton, GA 30004

Rooms To Go Drive Addition
Alteration
Construction
$180,000 est. value
Atlanta, GA 30305

1.122 Miles Of Widening and Reconstruction on SR 9 Beginning at The Fulton County Line and Extending To Mcfarland Rd (CR 458).
Infrastructure
Bidding

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Road Resurfacing
Results
Atlanta, GA 30303

T32-D7-Pcc-I-285-129361
Infrastructure
Bidding

T32-D7-PCC-I85 I75 Split SB-119952
Infrastructure
Post-Bid
GA

GSU Stadium Road Development - Phase II
Results
Less than $487,385 est. value
Atlanta, GA 30312

On-Call Pothole and Pavement Repair Services
Term Contract
Bidding
GA

Last Updated 02/11/2022 07:54 AM
Project Title

Northeast Trail Phase II - Segment II Construction

Physical Address View project details and contacts
City, State (County) Atlanta, GA   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Segment II of construction will consist of connecting the existing trail built by Georgia Power South to Westminster Drive, NE and North to the intersection of Mayson Street, NE and Plasters Avenue, NE. The improvements consist of but are not necessarily limited to the following: • Site demolition and applicable soil haul off as required by drawing specifications • Establishment and maintenance of erosion control per permitted plans throughout the duration of the Project • Grading and construction of stormwater conveyance system per permitted plans • Construction of a multi-use path as outlined in drawings • Lighting and camera installation and subsequent turn over/connection to the Atlanta Police Department (APD) and the City • Construction of ramp connection to Piedmont Avenue • Fiber duct bank installation • Installation of Eco-counters • Bridge enhancements to existing bridges over Clear Creek and the Buford Springs Connector

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents