Similar Projects
Medina Municipal Airport Dry Detention Basin
Infrastructure
Bidding
$178,000 est. value
Medina, OH 44256

Storm Sewer Outfall Repairs
Infrastructure
Bidding
$450,000 est. value
Willoughby, OH

MACC Task Order: USAF Repair Storm Drain Facility 10262-10266 WPAFB, OH - Project #17-0053
Post-Bid
Wright Patterson Air Force Base, OH

Waterline/ Storm Drainage/Walking Path Project
Post-Bid
Less than $504,000 est. value
Lakeview, OH

Lock 9 Park Utility Project
Results
Less than $581,247 est. value
Piqua, OH 45356

Washington Way and Jefferson Drive Storm Sewer Improvements
Results
Less than $570,953 est. value
Mason, OH 45040

2021 Citywide Asphalt Resurfacing and ADA Curb Ramps Project
Infrastructure
Bidding
$293,095 est. value
Marietta, OH

Various Catch Basins
Post-Bid
Canton, OH 44702

Debris Racks and Access Road Improvements in Various Locations Design/Build
Results
$285,687 est. value
Cleveland, OH 44115

2021 Center Alley Stormwater Outfall Repair
Alteration
Bidding
Less than $120,000 est. value
Ashville, OH 43103

Rebuild Test Structure - Lima, OH
Post-Bid
$1,000,000 to $5,000,000 est. value
Lima, OH

49th Street NorthWest Storm Sewer Rehabilitation
Results
$1,076,184 est. value
Canton, OH 44702

6th and Main Streets Storm Sewer Improvements 2021
Infrastructure
Bidding
Less than $58,100 est. value
Jacksonville, OH 45732

Harry Sauner Storm Sewer Improvements
Post-Bid
Less than $210,000 est. value
Hillsboro, OH 45133

East Franklinton Phase 1- 650560-100001 and 690236-100084
Results
Columbus, OH

Reported 05/26/2021 12:00 AM
Project Title

Storm Sewer Improvements

Physical Address View project details and contacts
City, State (County) Fostoria, OH   (Seneca County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of installing approximately 2807 feet of new storm sewer on North Main Street between Culbertson Street and Jones Road. Work scope includes trench excavation, installing storm sewer pipe, curb inlets and manholes, pavement repair, and site restoration.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents