Similar Projects
Central Library / Electrical, Concrete and Structural Modifications Project
Renovation
Results
$130,000 to $150,000 est. value
Aurora, CO

2019 Juniper School Renovation Project
Renovation
Results
Durango, CO 81303

Jeffco Efficiency and Future Readiness
Post-Bid
Westminster, CO

Office/Bathroom Remodel at The Lake Administration Building
Post-Bid
Gunnison, CO

Centauri High School Requirement Early Site and Utilities Package Project
Construction
La Jara, CO 81140

North Boulder Library
New Construction - 10,718 SF
Post-Bid
Less than $8,000,000 est. value
Boulder, CO 80304

General Contractor Prequalification & Open Enrollment
Post-Bid
Denver, CO

French Field Press Box Remodel Project
Renovation
Results
$150,000 to $200,000 est. value
Fort Collins, CO 80526

Poudre River Public Library Architectural Design Services
Post-Bid
Fort Collins, CO

Construction Services Trades from Certified Business
Term Contract
Post-Bid
CO

MCC Library & Tutor Center Renovation
Renovation
Post-Bid
$295,000 est. value
Fort Morgan, CO 80701

Architectural Design Services for Clifton Capital Project
Addition
Bidding
CO

Last Updated 08/05/2020 01:01 PM
Project Title

2021 Renovations at Four Sites

Physical Address View project details and contacts
City, State (County) Denver, CO (Adams, Denver Counties)
Category(s) Education
Sub-Category(s) Library - School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $1,399,317
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

2021 Renovations at Coyote Ridge Elementary, Eagleview Elementary, Riverdale Elementary and Silver Creek Elementary Provide Construction Manager General Contractor (CM/GC) services for renovations at the (4) Elementary School Sites as indicated herein. CM/GC to provide preconstruction, construction, and post construction services to successfully complete the project on time, within budget, and in strict accordance with the project design and specifications. Preconstruction services shall include working closely with the Project Architect during Schematic Design (SD), Design Development (DD), and Construction Document (CD) phases beginning in July of 2020. Followed by the construction phase starting in late May, 2021 and on through completion of the project by August 1, 2021.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents