Similar Projects
2020 Provo City Sidewalk Replacement Project
Post-Bid
Provo, UT

2020 Geneva Park Parking Lot Project
Post-Bid
$375,000 to $445,000 est. value
Orem, UT 84057

Historic Utah Southern Rail Trail - via UPRR, Lehi Metropolitan Planning Organization
Results
$500,000 to $1,500,000 est. value
UT

Y--Provo Area Office Parking Lot Replacement
Results
$1,000,000 to $5,000,000 est. value
Provo, UT 84606

Lowe's #2293 - Parking Lot Rehabilitation
Renovation
Post-Bid
Lehi, UT 84043

150 North Street and Improvement Project
Results
Less than $270,905 est. value
Pleasant Grove, UT 84062

Crossroads Boulevard/Lehi Main Street Widening Project
Post-Bid
Less than $13,115,529 est. value
Lehi, UT 84043

Poplar Lane Trailhead Parking Lot
Results
Spanish Fork, UT 84660

2020 Trail Project
Post-Bid
Salem, UT 84653

Utah Lakeshore Trail Hotpots and Amanda Lane Trails
Results
$500,000 to $1,500,000 est. value
UT

500 East 600 South Design
Post-Bid
Salem, UT 84653

2021 Provo City Sidewalk Replacement Project
Results
$200,000 to $250,000 est. value
Provo, UT 84606

Bike-Skills Trails Park Phase 2
Post-Bid
Orem, UT 84057

800 South Road Improvement Project
Results
Alpine, UT

2020 400 North Mitylite Crosswalk Project
Post-Bid
$30,000 to $350,000 est. value
Orem, UT 84057

Reported 11/07/2020 12:00 AM
Project Title

Parking Lot Improvement Project

Physical Address View project details and contacts
City, State (County) Salem, UT   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value Less than $26,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements include resurfacing and re-grading asphalt to create two handicapped accessible spaces including a van accessible space. The entire parking lot will be resurfaced, and all parking stall lines will be repainted. The number of parking spaces will be increased from 23 to 29 and the sidewalk will be widened for wheelchair access. Traffic will be re-routed one-way to enter from SR 198 and exit onto 400 N creating a safer traffic pattern for families loading small children with disabilities.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents