Similar Projects
Forest Hills Pipe Lining
Infrastructure
Bidding
North Charleston, SC

Ditching/Drainage Repair-Charleston
Infrastructure
Bidding
Ravenel, SC

Ashley Villas Drainage Improvements Phase 3
Post-Bid
North Charleston, SC 29405

Phase 3 Internal Drainage Improvements
Post-Bid
Isle of Palms, SC 29451

Dunoon Drive Drainage Improvement Project
Results
Less than $64,640 est. value
Charleston, SC 29401

Accabee Drainage Improvement - Phase II
Results
Less than $622,420 est. value
North Charleston, SC 29419

Road Work - E. Ashley Avenue, Folly Beach Drainage Improvements, Waterline Replacement and Sidewalk Replacement CTC
Infrastructure
Bidding
Charleston, SC

Fretwell Street Drainage Improvements
Post-Bid
North Charleston, SC 29406

Pepperhill Park Drainange Improvements
Results
North Charleston, SC 29419

Folly River Park Retaining Wall
Infrastructure
Post-Bid
Folly Beach, SC 29439

Ezekiel Avenue Drainage Improvement CTC
Results
North Charleston, SC 29405

Grimball Road Drainage Improvements
Results
SC

Construction Services Low Battery Restoration Project - Phase II
Results
Charleston, SC 29401

Royall Avenue Drainage Improvements
Results
Mount Pleasant, SC 29464

Dorchester Road Drainage Improvements
Results
$467,620 est. value
North Charleston, SC 29418

Last Updated 08/26/2021 03:10 PM
Project Title

Boyces Wharf Drainage Improvement Project

Physical Address View project details and contacts
City, State (County) Charleston, SC   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work is located on Concord Street adjacent to the Joe Riley Waterfront Park near Boyces Wharf in Charleston, SC and generally consists of the installation of two 2’x2’ grate inlets, installation of approximately 80 feet of C900 pipe with connections to new and existing inlets, resetting of an existing grate inlet top, installation of two 12” WaStop check valves (sizes to be field verified by Bidder prior to Bid), restoration of asphalt roadway, restoration of the area as needed, and traffic control, as shown on the Construction Drawings.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents