Similar Projects
2022 Electrical PPI
Alteration
Results
Fort Wayne, IN

Electrical Distribution Equipment- MCC-S/S1
Term Contract
Post-Bid
$700,000 CJ est. value
Fort Wayne, IN 46802

FWCS 2023 Site and Traffic PPI
Infrastructure
Post-Bid
$500,000 CJ est. value
Fort Wayne, IN 46802

Traffic Signals Modernization
Infrastructure
Post-Bid
$1,980,484 CJ est. value
Fort Wayne, IN 46802

Goshen Road Roundabout Lighting improvements
Infrastructure
Results
$29,902 CJ est. value
Fort Wayne, IN 46818

LED Lights / Fixtures
Term Contract
Post-Bid
Fort Wayne, IN 46802

Covington Road and West Hamilton Road Intersection Signalization
Infrastructure
Post-Bid
$300,000 CJ est. value
Aboite Township, IN 46814

Adams Elementary Security and Light­ing Improvements
Renovation
Post-Bid
$120,000 CJ est. value
Fort Wayne, IN 46803

Install a Localizer Antenna on Runway 32 at the Fort Wayne International Airport
Infrastructure
Post-Bid
$200,000 CJ est. value
Fort Wayne, IN 46809

Levan Scott Academy Bid Phase 2: Architectural and MEP
Alteration
Post-Bid
$1,600,000 est. value
Fort Wayne, IN 46806

St. Joe Dam PLC Replacement Project
Alteration
Results
$3,000,000 est. value
Fort Wayne, IN

FLP to WWPS Power Resiliency Phase I
Alteration
Results
$300,000 est. value
Fort Wayne, IN

Switchgear/Control House Requirements
Alteration
Post-Bid
Fort Wayne, IN

Transformer Equipment
Alteration
Post-Bid
Fort Wayne, IN

New Haven Public Works Solar Array
Alteration
Results
New Haven, IN 46774

Reported 07/14/2023 12:00 AM
Project Title

Bluffton Corridor Signal Upgrade

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46819   (Allen County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction Start Expected 2023,
Bids Due View project details and contacts
Estimated Value $536,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Biddershall furnish all labor, insurance, equipment, materials and power for the complete performance of this project as follows: The addition ofsignal detection along the Bluffton Road corridor from Winchester Road to Brooklyn Avenue, in addition to APS upgrade at Brooklyn Ave. all in accordance with the Bidding Documents and Drawing No. ST- 0742T as prepared by Traffic Engineering Services for the City of Fort Wayne, Indiana. No bid will be accepted from, or contract awarded to any person, firm, or corporation that is in arrears to the City, upon any debt or contract, or who has failed to execute, in whole or in part in a satisfactory manner, any contract with the City; or, who is a defaulter as to surety or otherwise, upon any obligation to the City. No bid may be withdrawn after the scheduled time for receipt of bids for at least ninety (90) days to allow review of bids before announcing award of contract. The successful bidder may be required to furnish a satisfactory Labor and Material Payment Bond and Performance Bond each in the amount no less than one hundred (100%) percent of the contract price. The Board reserves the right to reject any and all bids for failure to comply with applicable laws and/or with the Instructions to Bidders. The Board also reserves the right to waive any defect in any bid. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Brad Fisher Email: Brad.Fisher@cityoffortwayne.org

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents