Similar Projects
Absecon Inlet to Great Egg Harbor Inlet, Absecon Island, Atlantic County, NJ.
Post-Bid
$25,000,000 to $100,000,000 est. value
Absecon, NJ

Fire House No. 1 Flood Protection Project
Post-Bid
Margate City, NJ 08402

The Atlantic City Expressway 2019 Culvert Rehabilitation Project
Results
Hammonton, NJ 08037

Magnolia Avenue Drainage Improvements
Results
Galloway, NJ

Wabash Avenue Drainage Improvements
Post-Bid
Linwood, NJ 08221

Amherst Avenue Bulkhead Replacement Project
Results
Margate City, NJ

Atlantic City Expressway 2020 Culvert Rehabilitation
Post-Bid
Hammonton, NJ 08037

Winchester Avenue Drainage Improvements
Results
Ventnor City, NJ

Maintenance Timber/Underwater/Drainage Structural Repair
Results
$5,000,001 to $10,000,000 est. value

Drainage Improvements, Marshall Avenue and Oxford Avenue
Results
$227,528 est. value
Ventnor City, NJ 08406

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Replacement Bulkhead and Stormwater Improvement
Results
Atlantic City, NJ 08401

Beachfill Nourishment
Results
Egg Harbor City, NJ

Drainage and Roadway Improvements, Beach Avenue 8th to 10th Streets South
Results
Brigantine, NJ 08203

Drainage Restoration Contract, Statewide -2019
Results
$5,000,001 to $10,000,000 est. value

Last Updated 09/17/2020 11:11 AM
Project Title

Drainage Rehabilitation of West End Wellington Avenue (CR629) Between Harrisburg and Trenton Avenue

Physical Address View project details and contacts
City, State (County) Atlantic City, NJ 08401   (Atlantic County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the removal & replacement of storm water pipe, relining of storm water pipe via Cured-In-Place-Pipe (CIPP) method, and final asphalt surface restoration along West End – Wellington Ave. (CR629) between Harrisburg and Trenton Ave. in Atlantic City, NJ. During the first phase, removal & replacement of storm water pipe, the Contractor shall furnish all necessary labor, tools, equipment, materials, dewatering measures, traffic control, and by-passing capability to remove & install 20 LF of 18” Reinforced Concrete Pipe via direct burial. The second phase, relining of storm water pipe, will involve the Contractor furnishing all necessary labor, tools, equipment, materials, dewatering measures, traffic control, and by-passing capability to clean, video inspection(s), and installation of Cured-In-Place-Pipe (CIPP) lining of 275 LF of 18” Terracotta Pipe extending along West End Ave. (CR629) between Harrisburg and Trenton Ave. Lastly, the third phase, final asphalt surface restoration, will involve the Contractor furnishing all necessary labor, tools, equipment, materials, and traffic control to complete a 2” thick, mill & asphalt surface paving complete with all traffic striping, pavement markings, and RPMs.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents