Similar Projects
Spout Springs ES Access Drive Modifications
Bidding
Flowery Branch, GA 30542

Joint 2020 Local Maintenance and Improvement Grant
Post-Bid
Byron, Centerville, Hawkinsville, Perry, Warner Robins, GA

Lake Joy Road Phase 5 Improvement
Post-Bid
Perry, GA 31069

Southern Region Disaster Recovery Support BPA
Results

15.736 Miles of Milling, Plant Mix Resurfacing and Shoulder Rehabilitation on I-75/SR 401 Beginning South of SR 26 and Extending to SR 96
Results

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

20.572 Miles of Milling, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 224 Beginning North of SR 26 and Extending West to SR 7
Results

Joint 2020 Local Maintenance And Improvement Grant
Post-Bid
Perry, GA

7.891 Miles of Milling, Inlay, Plant Mix Resurfacing and Single Surface Treatment Paving
Results
GA

2021 LMIG Project
Post-Bid
Mount Vernon, GA

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

2.786 Miles of Milling and Plant Mix Resurfacing on SR 11 Conn Beginning at SR 7 And Extending East of SR 11
Results
GA

LMIG Street Resurfacing
Results
College Park, GA 30337

2021 SPLOST Milling and Resurfacing of Various Streets in Commission Districts 1 and 2
Results
Ellenwood, Forest Park, Lawrenceville, Macon, Morrow, Rex, Riverdale, Stockbridge, Union City, Warner Robins, Woodstock, GA 30294

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

Last Updated 02/19/2021 09:00 AM
Project Title

Grade, Base, and Paving of Terrell Road

Physical Address View project details and contacts
City, State (County) Perry, GA 31069   (Houston County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $789,048
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction consists of furnishing all materials and equipment and performing all labor necessary to complete the Grade, Base, & Paving of Terrell Road, (project roadway length is 1.13 miles). Work includes grading, soil cement base placement, and triple surface treatment paving, storm drainage, and the implementation of the erosion, sediment, and pollution control plan and comprehensive monitoring program. Further work includes installation of water mains.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents