Similar Projects
Upgrade Cleveland/Ashley Water Treatment Plant - 2023-706 - City of Pittsfield
Infrastructure
Conception
$50,000,000 CJ est. value
Pittsfield, MA 01201

Sludge Handling Process Improvement - SW003 - City of Newburyport
Infrastructure
Conception
$1,100,000 CJ est. value
Newburyport, MA 01950

Tri-Town Regional Water Treatment Plant
Infrastructure
Design
$70,000,000 CJ est. value
Braintree, MA 02184

PFAS Treatment at North Acton WTP - Acton Water District
New Construction, Infrastructure
Design
$6,872,000 CJ est. value
Acton, MA 01720

Deer Island Treatment Plant Clarifier Rehabilitation, Phase II
Renovation, Infrastructure
Bidding
$195,000,000 CJ est. value
Winthrop, MA 02152

RFQ Contractor - Oak Bluffs Wastewater Treatment Facility - General Bid
Renovation
Bidding
$22,000,000 CJ est. value
Oak Bluffs, MA 02557

Deer Island Treatment Plant Clarifier Rehabilitation, Phase II - Sub
Renovation, Infrastructure
Sub-Bidding
$195,000,000 CJ est. value
Winthrop, MA 02152

Plymouth Airport WWTF Improvements - Sub Bid
Renovation
Sub-Bidding
$3,200,000 CJ est. value
Plymouth, MA 02360

HVAC Automation and Replacement Deer Island Waste Water Treatment Plant-General
Renovation
Post-Bid
$71,562,000 CJ est. value
Sudbury, MA 01776

Grimaldi Pump Station and WWTF Improvements Project - General Bid
Renovation
Post-Bid
$525,000 est. value
North Attleborough, MA

Wastewater Treatment Facility Upgrades - General Bids
Results
Less than $12,975,000 est. value
Orange, MA 01364

Prison Point CSO Facility Improvements - General Bids
Results
Less than $42,500,000 est. value
Boston, MA

RFQ Contractor - Falmouth Waste Water Treatment Facility - GC Bid
Renovation
Bidding
$24,000,000 CJ est. value
E Falmouth, MA 02536

Construction of a New 1.7 Mgd Water Treatment Plant - Sub
New Construction, Infrastructure
Sub-Bidding
$11,900,000 CJ est. value
Townsend, MA 01469

Owners Project Manager for the Construction of Wastewater Treatment Facility and Phase 1 of Sewer Collection System
New Construction
Post-Bid
$160,000,000 est. value
West Yarmouth, MA

Last Updated 11/28/2022 03:31 PM
Project Title

Refurbish Sodium Hypochlorite Tank 1 West Odor Control, DITP

Physical Address View project details and contacts
City, State (County) Winthrop, MA 02152   (Suffolk County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Site Description: The MWRA (facility name) is a large Pump Station located at (street Address). The construction staging area and work area are mostly flat and unpaved and access is only possible through the facility parking lot. The White River passes through the northeast corner of the property and within 300' of the work. Ancillary work must be done on First Street which is a four lane, two-way, city street running north to south in front of the facility and is less than two blocks from City High School. The Pump Station hasfour buildings which house critical equipment and the MWRA must be able to access, operate, and maintain this equipment throughout construction. The construction site limits will be clearly marked in the field and a sketch is included as submittal 001. The Pump Station stores and transports bulk volumes of regulated materials, most of which are corrosive, inside the construction work area. The Pump Station has many unlabeled confined or restricted spaces. All such spaces including manholes, basins, basements, vaults, pipes, or equipment are considered to be permit required confined spaces unless otherwise described in writing by the MWRA. The Pump Station has a very significant hydraulic profile and the forces associated with the hydraulics are of a vast magnitude. Care must be used whenever working on or near piping, valves, pumps, or vessels of any kind. "7. The fill pipe within the tank secured by the fill pipe brackets is a 4" CPVC Schedule 80 pipe with an outside diameter of 4 1/2 " (4.500)". Site access will not be permitted without the consent of the Project Manager, Timothy Jonah, Assets Manager. Please contact via e-mail timothy.jonah@mwra.com or phone 617-660-7736.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents