Similar Projects
Marantha Christian Academy
Build-Out - 28,000 SF
Conception
Mattoon, IL 61938

Toilet Room Renovations - Fulton High School
Renovation
Bidding
$450,000 est. value
Fulton, IL 61252

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

CM at Risk - Partial High School Replacement and Junior High School/High School Renovation
Renovation
Results
Toulon, IL 61483

2021 Life Safety Implementation
Results
Kangley, Streator, IL 61364

High School Gym Replacement at Argenta-Oreana High School
Addition - 16,187 SF
Construction
Less than $4,200,000 est. value
Argenta, IL 62501

LIFT Innovation Center
Renovation - 49,700 SF
Construction
Mattoon, IL 61938

Toilet Room Remodel at McGaughey Elementary School
Renovation
Post-Bid
Mount Zion, IL 62549

Interior Renovations
Results
Less than $120,000 est. value
Akin, IL

New Litchfield Elementary School - Bid Group No. 2
New Construction - 42,071 SF
Post-Bid
$13,000,000 to $14,000,000 est. value
Litchfield, IL 62056

Renovations to Existing Science Lab
Renovation
Results
Table Grove, IL

Metal Building
Renovation
Post-Bid
McLeansboro, IL

High School Gym Building Refacing & Window Replacement
Renovation
Results
Cerro Gordo, IL 61818

Concrete Work at MHS Football Field Home Bleacher Site
Alteration
Post-Bid
Mattoon, IL 61938

Last Updated 05/17/2022 03:29 PM
Project Title

Summer 2022 Maintenance and STEM Labs

Physical Address View project details and contacts
City, State (County) Morton, IL 61550   (Tazewell County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of but not limited to updates to finishes in several classrooms across the district (see locations above). Work includes masonry partitions, cutting patching of floor, laboratory casework, drop ceilings, raising floor, interior stair, unit ventilators, exhaust fans, and miscellaneous mechanical, electrical, and plumbing work to support the room.

Details

Elementary School, Renovation, Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents