Similar Projects
Bliss/Main/Fabyan Intersection Realignment
Infrastructure, Alteration
Bidding
$220,000 est. value
Geneva, IL 60134

Laurel Street Culvert Replacement
Post-Bid
Elgin, IL 60120

Milton Township - Mulberry Culvert Lining
Infrastructure
Post-Bid
Algonquin, IL

7th Avenue Creek Construction Phase 1
Results
Saint Charles, IL

Ellithorpe Road Culvert Replacement
Results
Burlington, IL 60140

Island Park Drainage Improvements
Infrastructure
Post-Bid
Geneva, IL 60134

Improvement Consists of a Culvert Repair of the Structure (SN 045-0299)
Results
IL

Fay`s Lane and Whispering Oaks Lane Water Main and Roadway Improvements
Infrastructure
Post-Bid
Sugar Grove, IL 60554

2021 HMS Culvert Replacement - Bid Release 4
Results
Hampshire, IL 60140

Aintree Road Full Depth Reclamation
Infrastructure
Post-Bid
Saint Charles, IL

Culvert Removal and Replacement
Results
Kaneville, IL 60144

Parking Lot N4 Drainage Improvements
Results
Sugar Grove, IL 60554

Fox River West Dam And Canoe Chute Repair
Results
Aurora, IL

Culvert Repairs for the Structure
Infrastructure
Results
Campton Hills, IL

Freeman Road Culvert Replacement
Infrastructure
Results
$133,445 est. value
Huntley, IL

Reported 04/20/2022 12:00 AM
Project Title

Stearns AMP Embankment Restoration

Physical Address View project details and contacts
City, State (County) Campton Hills, IL   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Campton Hills, Illinois. Completed plans call for site work for a water / sewer project. The work shall consist of the reconstruction of the damaged embankment and protect against erosion from future high flows from Brewster Creek through the installation of an articulated concrete block revetment mat. Also included is the removal of trees and the removal and disposal of unsuitable material primarily in scour areas. Replacement of an existing detention release structure is also included. - Bidder Prequalification/Preregistration Required Question Acceptance Deadline 04/15/2022 04:00 PM EDT

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents