Similar Projects
Redfern Properties High Rise Apartments
New Construction - 180,000 SF
Conception
$5,000,000 to $10,000,000 est. value
Portland, ME

15 Harrison Road Senior Housing
New Construction
Conception
$15,000,000 est. value
Bridgton, ME 04009

The Residences at Crosstree
New Construction - 1,045,296 SF
Design
$10,000,000 CJ est. value
Scarborough, ME 04074

Stacy M. Symbol Apartments
New Construction
Design
Westbrook, ME

Port Resources Group Homes
Renovation
Post-Bid
South Portland, ME 04106

2022 Bond - School Construction Projects - Cape Elizabeth School Department
New Construction, Infrastructure
Post-Bid
$115,900,000 CJ est. value
Cape Elizabeth, ME 04107

Scattered Sites Redevelopment Construction Manager at Risk
Infrastructure
Results
$1,100,000 est. value
Portland, ME

Statewide Geotechnical Drilling
Infrastructure
Results

Hobson's Landing - Master Plan - Phase 1&2
New Construction - 490,508 SF
Construction
$10,000,000 CJ est. value
Portland, ME 040101

Shipyard Brewery Redevelopment
New Construction, Demolition - 114,000 SF
Construction
$10,000,000 CJ est. value
Portland, ME 04101

Three Diamond Holdings
New Construction - 383,200 SF
Pending Verification
Scarborough, ME 04074

Cumberland Street Mixed Use
New Construction - 3,900 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Westbrook, ME 04092

MPI DOT Paving Stevens Avenue - City of Portland
Infrastructure
Conception
$450,000 CJ est. value
Portland, ME 04103

Rivermeadow Residential Development - Phase 1
New Construction
Design
Westbrook, ME 04092

RFP Construction Manager at Risk - Front Street Redevelopment Construction Manager at Risk
Infrastructure
Post-Bid
$43,460,000 CJ est. value
Portland, ME 04103

Last Updated 11/09/2022 11:36 AM
Project Title

The Mark at Cumberland Foreside

Physical Address View project details and contacts
City, State (County) Cumberland Foreside, ME 04110   (Cumberland County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $15,700,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: site work and new construction of a 64,795 square foot, four story above grade multi-residential development. Destefano & Associates is the Construction Manager for the construction of The Mark at Cumberland Foreside. We are seeking bid proposals for divisions 02900 through 16000. The trades being sought include concrete flatwork, appliances and toilet accessories The following documents are provided for use in preparing a bid. 1.) Architectural plans by Mark Mueller Architects dated 6/21/2022 issued for construction 2.) Finish plans by Bowerbird Design Collective dated 6/21/2022 issued for construction 3.) Structural plans by Structural Integrity dated 6/21/22 issued for construction 4.) Electrical plans by Bennett Engineering dated 6/10/2022 5.) Plumbing plans by Bennett Engineering dated 6/10/2022 6.) Mechanical plans by Bennett Engineering dated 6/10/2022 7.) Site plans by Sevee & Maher Engineers dated 6/20/22 issued for construction 8.) Geotech report by Summit Geoengineering dated 11/19/21 9.) Bid specification document The project is fully funded and building permit is expected shortly. Refer to the schedule document for the proposed construction schedule. Add alternates that need to be included if apart of scope; Radiant floor heating in the first floor bathrooms Change to triple pane windows & doors -see note A2 of the details Change electrical ranges to GE Model JGB735SPSS Change carpet to LVT in all bedrooms - see note A4 of the details Change the 2 bedroom unit master shower to tile - see note A5 of the details Please reference: Billing Instructions for DA 2-18-22 DeStefano Insurance Notice Requirements 2020 Safety Procedures for Contracts to Subs Supplemental General Provisions 5-1-2018 Any questions during the bid period shall be directed to Keegan Taylor by email at Keegant@destefano-associates.com

Details

4 Stories Above Grade, 64,795 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents