Similar Projects
Brentwood Boulevard Sewer and Water Main - 562-56392 - City of Brentwood
Infrastructure
Conception
$2,812,000 est. value
Brentwood, CA

Pump Station 2.4 Installation - City of Brentwood
Infrastructure
Conception
Brentwood, CA 94513

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Primrose School - Orchards Shopping Center / Walnut Creek
New Construction, Infrastructure - 12,838 SF
Design
$2,800,000 CJ est. value
Walnut Creek, CA 94598

Starbucks / Pittsburg
New Construction, Infrastructure - 2,000 SF
Bidding
$620,000 CJ est. value
Pittsburg, CA 94565

Starbucks / Pittsburg
New Construction, Infrastructure - 2,000 SF
Bidding
$620,000 CJ est. value
Pittsburg, CA 94565

Parking Lot Sweeping and Pressure Washing and/or Steam Cleaning Services at the Concord DMV Field Office
Term Contract
Post-Bid
Concord, CA 94520

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Paving Repairs and Ramps at FHFB
Term Contract
Results
Richmond, CA

Water Leak Repair-Richmond
Alteration
Results
$400,000 est. value
Richmond, CA 94804

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Waterline Improvement - Kent Drive - City Of Brentwood
Alteration
Conception
$336,000 est. value
Brentwood, CA 94513

2500 Bates Avenue / Conco Building
New Construction, Infrastructure - 61,630 SF
Design
$7,500,000 CJ est. value
Concord, CA 94520

CA NPS 2021(1), Pavement Preservation Bay Area
Term Contract
Post-Bid
$2,000,000 to $3,000,000 est. value
Danville, Martinez, Mill Valley, San Francisco, CA 94526

Last Updated 09/12/2022 12:15 PM
Project Title

First Street Rain Garden

Physical Address View project details and contacts
City, State (County) Lafayette, CA 94549   (Contra Costa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $546,883 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

including, but not limited to: mobilization; traffic control and construction signage; clearing and grubbing including tree and vegetation trimming; removal and disposal of asphalt concrete pavement and subgrade, concrete curb, gutter, sidewalk, curb ramps, and chain link fencing; construction of minor concrete structures, concrete curb, gutter, sidewalk, curb ramps; storm drain facilities, stabilized decomposed granite pathways, landscaping, irrigation; lighting and electrical improvements, traffic stripes, markers, markings and signage; and all other miscellaneous work as shown on the Plans and as described in the Specifications to provide a complete project. The Contractor shall possess a Class "A" license at the time this contract is awarded. Bidder's attention is directed to requirements in Sections 2 and 3 of the Standard Specifications General Provisions. All bids shall be accompanied by a cashier's or certified check, or a bidder's bond executed by a corporate surety insurer. The bidder's guarantee shall be in the amount equal to at least ten (10) percent of the total bid and shall be made payable to the City of Lafayette. The successful bidder shall furnish a payment bond and a performance bond. The City reserves the right to waive any informalities or to reject any or all bids. The City Council has ascertained the General Prevailing Rates of Wages applicable to this work, and these rates are on file in the office of the City of Lafayette Engineering Services Division. Time of completion allowed for this project will be sixty-five (65) working days. Bidder's attention is directed to the schedule stated in Section SP-8 of the Special Provisions. Questions regarding the project plans or specifications may be directed to Matt Luttropp, City Engineering Office, (925) 284-1951.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents