Similar Projects
2023 North Side High School Stadium Restoration
Renovation
Post-Bid
$174,000 CJ est. value
Fort Wayne, IN 46805

Fishers Gateway Arena / Fishers
New Construction, Infrastructure
Pending Verification
$26,000,000 CJ est. value
Fishers, IN 46038

Phase II Skatepark Expansion
Addition, Demolition, Infrastructure
Post-Bid
$200,000 CJ est. value
New Castle, IN 47362

Stadium Rehabilitation
Renovation
Post-Bid
Merrillville, IN 46410

Lucas Oil Stadium Locker Room
Renovation
Post-Bid
Indianapolis, IN 46225

Gainbridge Fieldhouse - Video Production System Room Renovation
Renovation
Post-Bid
$550,000 CJ est. value
Indianapolis, IN 46204

BL601 – Memorial Stadium – Lighting Replacement (LED)
Renovation
Post-Bid
Bloomington, IN 47405

Spencer Elementary School Gym and Press Box Improvement Project
Renovation
Post-Bid
Spencer, IN 47460

Four Winds Baseball Field Expansion
New Construction
Pending Verification
South Bend, IN 46601

Ross Ade Stadium Renovation Phase One
Renovation
Post-Bid
$45,400,000 CJ est. value
West Lafayette, IN 47906

Ross-Ade Stadium East Condensate Line Replacement II
Renovation
Post-Bid
$350,000 CJ est. value
West Lafayette, IN 47906

Terre Haute Multi-Sports Complex and Waterpark - City of Terre Haute
New Construction, Infrastructure
Conception
$5,000,000 est. value
Terre Haute, IN

Terre Haute Multi-Sports Complex and Waterpark - City of Terre Haute
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Terre Haute, IN 47807

Four Winds Field Player Facility
Renovation, Infrastructure - 1,500 SF
Results
$2,000,000 CJ est. value
South Bend, IN 46601

Last Updated 01/23/2023 10:05 AM
Project Title

Greater Jasper Consolidated Schools - Alumni Stadium Renovations

Physical Address View project details and contacts
City, State (County) Jasper, IN 47546   (Dubois County)
Category(s) Entertainment/Recreation
Sub-Category(s) Stadium
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $8,596,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Alumni Stadium Renovation Project If Plans and Specifications are returned after this ten (10) day limit, or in an unusable condition, the deposit shall be forfeited to cover the cost of reproduction. All mailing costs shall be paid by the bidder. The successful bidder shall, upon acceptance of it's bid, be required to procure and pay for a Contractor's Bond for Construction (Form 86A or AIA Form A312) in an amount equal to it's contract price. Such bonds shall comply with all laws of the State of Indiana governing public contracts let by governmental units. Bids should be enclosed in a sealed envelope, addressed to the School Corporation, with the name and place of business of the bidder and the project name to which the bid relates on the envelope, all as more particularly set forth in the Instructions to Bidders. Bids should be made on the form included in the Project Manual which is based on the Indiana State Board of Accounts Form 96 (Revised 2013), and shall be accompanied by an acceptable certified check, cashier's check, or bid bond, executed by the bidder and an acceptable surety company, payable to the order of the School Corporation, in an amount not less than five percent (5%) of the total bid. In the event any bidder withdraws it's bid or fails to execute a satisfactory contract or contracts and furnish a satisfactory performance bond or bonds within ten (10) days after a contract or contracts has been awarded to such bidder by the School Corporation, the School Corporation may declare it's certified check or cashier's check or bid bond forfeited to the School Corporation as liquidated damages. The School Corporation shall have the right to accept any bid within sixty (60) days after the time of opening of the bids, during which time no bids shall be withdrawn; at any time to reject any and all bids for any reason at all; and to waive all formalities or irregularities in the bidding. Contractors will be required to complete their work within a certain specified period as provided in Section 01 32 00 Progress Schedule of the specifications.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents