Similar Projects
Jaycee Park Parking Improvements
Infrastructure
Bidding
$1,100,000 CJ est. value
Hattiesburg, MS 39401

Jaycee Park Parking Improvements
Infrastructure
Bidding
$1,100,000 CJ est. value
Hattiesburg, MS 39401

Forrest County Overlay
Infrastructure
Post-Bid
MS

RTI Track Widening and Overlay
Infrastructure
Post-Bid
Camp Shelby, MS

Quinn Street Speed Table and Sidewalk Project
Results
$100,000 to $125,000 est. value
Hattiesburg, MS 39401

Country Club Road Reconstruction
Infrastructure
Results
$1,947,200 est. value
Hattiesburg, MS

Tuscan Sewer Project - City of Hattiesburg
Infrastructure
Pending Verification
$600,000 CJ est. value
Hattiesburg, MS 39401

Grace Avenue Bridge Replacement - City of Hattiesburg
Demolition, New Construction, Infrastructure
Pending Verification
$400,000 CJ est. value
Hattiesburg, MS 39401

Jaycee Park Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Hattiesburg, MS 39401

Countywide Reseal on roads A through J
Infrastructure
Post-Bid
MS

Mill and Overlay approximately 1 mile on US 11 from Bouie Street to the Leaf River Bridge and Level and Overlay approximately 2 miles on SR 42 from the end of the 4-lane Section to the Perry County Line
Infrastructure
Results
MS

Repair and Rehabilitation of City Streets
Infrastructure
Post-Bid
Hattiesburg, MS

Pavement Restoration
Infrastructure
Results

Stadium Drive Parking Area
Infrastructure
Post-Bid
Hattiesburg, MS 39401

Paving, Marking and Pedestrian Pathway along Arledge Street, Edwards Street and Katie Avenue
Infrastructure
Results
$1,117,479 est. value
Hattiesburg, MS 39401

Last Updated 11/04/2022 02:06 PM
Project Title

Lillie Burney Neighborhood Sidewalk Project - City of Hattiesburg

Physical Address View project details and contacts
City, State (County) Hattiesburg, MS 39401   (Forrest County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $237,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Lillie Burney Neighborhood Sidewalk Project A detailed scope is not available. As of November 4, 2022, this project is in design. A timeline for bidding and construction has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents