Similar Projects
City Park Pond Seawall Replacement - City of Parkersburg
Infrastructure
Conception
$900,000 CJ est. value
North Parkersburg, WV 26104

Southwood Park Pond Seawall and Boardwalk Replacement - City of Parkersburg
Infrastructure
Conception
$1,000,000 CJ est. value
Parkersburg, WV 26101

Parkersburg - Williamstown
Infrastructure
Design
$3,000,000 CJ est. value
Mineral Wells, WV 26150

USMC PFC D Marshall Mem Br
Demolition, New Construction, Infrastructure
Design
$6,110,000 CJ est. value
Mineral Wells, WV 26150

Farm Demolition Project
Demolition, Infrastructure
Post-Bid
$70,000 est. value
Parkersburg, WV 26104

Spencer's Landing Fill Project
Infrastructure
Post-Bid
$70,000 CJ est. value
Vienna, WV 26105

Parkersburg Cbd Tl Ren +29
Infrastructure
Design
$800,000 CJ est. value
Washington, WV 26181

Williamstown AASF-1 Taxiway and Apron Repairs
Infrastructure
Post-Bid
$500,000 CJ est. value
Williamstown, WV 26187

Grand Central Ave ADA +2 (Split Funded)
Infrastructure
Design
$423,000 CJ est. value
Mineral Wells, WV 26150

Landlord Work - Grand Central Mall / Parkersburg
Build-out, Infrastructure
Post-Bid
$200,000 CJ est. value
Parkersburg, WV 26101

WV 14 ADA +4 (Split Funded)
Infrastructure
Design
$274,500 CJ est. value
Mineral Wells, WV 26150

Structure Replacement
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Parkersburg, WV 26101

Sen JF Deem Mem Bridge
Infrastructure
Design
$750,000 CJ est. value
Washington, WV 26181

CVS #6276 / Parkersburg
Build-out, Infrastructure
Post-Bid
$150,000 CJ est. value
Parkersburg, WV 26101

US 50 I/C N and S
Demolition, New Construction, Infrastructure
Design
$1,200,000 CJ est. value
Mineral Wells, WV 26150

Last Updated 04/20/2023 08:04 AM
Project Title

Chemours Hydrogen Production Facilities / Washington

Physical Address View project details and contacts
City, State (County) Washington, WV 26181   (Wood County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a hydrogen production facility. An exact scope of work has not been released. As of April 20, 2023, this project is in planning stage. Information regarding an architect and a general contractor has not been released. A firm construction timeline has not been confirmed. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents