Similar Projects
Impact of Heavy Trucks and Permitted Overweight Loads on Highways and Bridges
Term Contract
Results

Coconut Isle Bridge Replacement
Results
Less than $1,096,655 est. value
Fort Lauderdale, FL

Covered Bridge Repairs
Term Contract
Results
Coral Springs, FL 33065

Bridges and Miscellaneous Structures Repairs
Results
Fort Lauderdale, FL

Bridge Rehabilitation
Results
Less than $1,624,008 est. value
FL

Minor Bridges
Results
Less than $6,423,045 est. value
FL

Bridge Replacement
Results
Less than $1,922,763 est. value
FL

Construction Management at Risk Services for McNab Road and Bridge Improvements
Results
Pompano Beach, FL

R and R Minor Bridge
Results
Less than $616,996 est. value
FL

Asset Maintenance Contract
Results

Bascule Bridge Maintenance and Repair
Results
Less than $1,287,044 est. value
FL

Bridge Repairs
Results
Less than $200,000 est. value

Bridge Deck Striping
Results
Less than $500,000 est. value

Orange Drive Bridge Repairs
Results
Less than $100,250 est. value
Davie, FL 33314

Bridge and Concrete Maintenance
Results
Less than $400,000 est. value

Last Updated 06/07/2019 08:37 AM
Project Title

Construction Management at Risk Services for Various Bridge Improvement Projects

Physical Address View project details and contacts
City, State (County) Pompano Beach, FL   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Provide Construction Management at Risk (CMAR) Services to the City for the following projects: 1. Palm Aire Bridges (estimated construction $2,970,000 plus $44,550 for preconstruction services). Note: this project may entail other streetscape services as well. Phase I includes design only. Funding for construction (Phase II) will be available on/or after October 1, 2021. 2. South East 5th Avenue Bridge (estimated construction $1,845,000 plus $27,675 for preconstruction services). All work is expected to be completed in one phase. 3. Terramar Drive Bridge (estimated construction $1,125,743 plus $16,886 for preconstruction services). All work is expected to be completed in one phase.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents