Similar Projects
2022 Olympic Region Design Consultant Engineering Services - SR 3/SR 16/SR 160/Gorst Vicinity - Remove Fish Barriers
Infrastructure
Bidding
$8,000,000 to $12,000,000 est. value

Hazard Mitigation Plan Risk Assessment
Alteration
Bidding
Olympia, WA

Water System Zone Intertie Design Preparation
Infrastructure
Post-Bid

Water System Zone Intertie Design Preparation
Infrastructure
Post-Bid

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Electrical Engineering Services
Infrastructure
Post-Bid

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Engineering Consulting Services for Design and Construction of the Boulevard Road Reservoir Rehabilitation
Infrastructure
Results
Olympia, WA

On-Call Consulting Services
New Construction, Infrastructure
Post-Bid
Olympia, WA

FAA Airport Traffic Control Tower Design Competition
New Construction
Post-Bid

Rfq Multiple Engineering Service
Term Contract
Post-Bid

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Last Updated 03/10/2022 03:57 PM
Project Title

Conduct Bridge Load Ratings

Physical Address View project details and contacts
City, State (County) Olympia, WA   (Thurston County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes, Architecture and Engineering (A/E) firms to conduct bridge load ratings on up to 55 of the DNR’s 853 forest road bridges on DNR managed lands across Washington State. The project also includes determining section properties and appropriate load rating on bridges without plans, including concrete bridges.

Details

Architectural, New Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents