Similar Projects
East Hickman Force Main
Infrastructure
Bidding
$400,000 est. value
Lexington, KY

Wayland to Lackey Waterline Extension AMLER Program Project
Infrastructure
Bidding
$200,000 est. value
Mc Dowell, KY

Bloomfield Road S.R. 55 Waterline Replacements - Contract 23
Post-Bid
Taylorsville, KY 40071

Phase I Water Main Replacement
Post-Bid
Salem, KY

Chiller and Water Replacement at Westport Middle School
Results
Louisville, KY 40222

Montpellier Drive Water and Sewer Rehabilitation
Results
Fort Knox, KY 40121

Water and Sewer Infrastructure
Infrastructure
Pending Verification
$2,336,513 est. value
Pikeville, KY

Garrard County Water Association - Contract 1 - Water System Improvements
Infrastructure
Bidding
$2,000,000 est. value
Lancaster, KY

Waterline Replacement in Beauty and Lovely Areas
Post-Bid
Prestonsburg, KY

2019 Water System Improvements
Results
$2,000,000 to $2,500,000 est. value
Brandenburg, KY

US 25 West Major Widening Waterline Relocation Phase 1
Infrastructure
Bidding
$93,500 est. value
Williamsburg, KY 40769

US 60 Main Street Water Main Replacement Phase I/Phase 2A
Post-Bid
Mount Sterling, KY 40353

Distribution System Site Development
Renovation
Results
Burgin, Harrodsburg, KY 40330

Water Line Construction Materials
Infrastructure
Bidding
Elizabethtown, KY

Pitman Creek Wholesale Fire Protection - Contract 1
Post-Bid
Danville, KY 40422

Reported 07/09/2022 12:00 AM
Project Title

Holmes Bend Campground Water Line Replacement

Physical Address View project details and contacts
City, State (County) Columbia, Creelsboro, KY 42629 (Adair, Russell Counties)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected October 2022
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide all materials, equipment, and labor to replace the trunk water line from the meter box at Holmes Bend campground entrance to the front of building 12 which is the end of the line. The contractor's work and responsibility will include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents