Similar Projects
Last Updated | 05/15/2023 05:41 PM |
Project Title | Flooring Abatement and Replacement - Haskell Building |
Physical Address | View project details and contacts |
City, State (County) | Northampton, MA 01060 (Hampshire County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $102,900 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project will require the furnishing and installation of carpet square flooring and removal, disposal, and abatement of existing floor tiles. Minimum rates of wages to be paid on the project have been determined by the Commissioner of the Division of Occupational Safety under the provisions of Sections 26 and 27, Chapter 149 of the General Laws and will be in- cluded in the bid package. Each general bid and sub-bid proposal must be secured by an uploaded photocopy of an accompanying deposit of 5% of the total bid amount, including all alternates, in the form of a bid bond, a certified treasurer's or cashier's check issued by a responsible bank or trust company made payable to the Commonwealth of Massachusetts. Award- ed vendor will then mail the original 5% deposit bond or check to the Department of Mental Health, Office of En- gineering and Facilities Management, 167 Lyman Street, Room 158, Westborough, MA 01581. The Department re- serves the right to waive any informality in or reject any or all Bids if it is in the public interest to do so. After attending the Mandatory Pre Bid Conference, all bidder questions must be uploaded to electroncially by 12:00 P.M. Friday 3/24/2023. Covid-19 Precaution Notice: Anyone attending site view- ing(s) will be required to follow state and city precaution guidelines by wearing the necessary face mask and prac- ticing safe distancing. Project duration is forty-five (45) calendar days. MBW/WBE Contractors are encouraged to inquire about this project. Category of Work: FLOORING Abate the existing 9X9 asbestos flooring, existing carpet, and prep for installation of new carpet |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |