Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Gravity Sanitary Sewer Lateral Lining Technology Selection
Post-Bid
Sarasota, FL 34236

Rivertown Kendall Drive - Phase 2
New Construction
Post-Bid
Jacksonville, FL

J--Sanitary Sewage Lift Station
Results
West Palm Beach, FL 334106400

Phase I Wastewater Utility Upgrades
Results
Less than $2,703,260 est. value
Freeport, FL

Private Lateral Line Rehabilitation Project
Post-Bid
Saint Petersburg, FL 33731

On-Call Plumbing/Sewer and Drain Services
Results
Tallahassee, FL 32312

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Grand Ridge Sewer Extension Hwy 69
Results
Grand Ridge, FL 32442

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Sanitary Sewer Capacity Improvements
Results
Less than $15,000,000 est. value
Saint Pete Beach, FL 33706

SR 20 Forcemain Upgrade - Lafayette L.S. to South Jackson Street and US-331 Forcemain Repair at Jolly Bay Road
Post-Bid
Santa Rosa Beach, FL

English Oaks Force Main Phase III Section 2C
Results
$2,900,000 est. value
Lakeland, FL 33801

Lincoln Park Water and Sewer Improvements
Results
$1,600,000 est. value
Arcadia, FL 34265

Sanitary Sewer/ Storm Drain Maintenance and Repair
Term Contract
Results
Lauderdale-by-the-Sea, FL 33308

Last Updated 04/24/2020 11:51 AM
Project Title

Construction Services for Minor Utility Services

Physical Address View project details and contacts
City, State (County) Wildwood, FL 34785   (Sumter County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City is soliciting responses from qualified and experienced firms to provide Minor Utility Construction Services on an as-needed basis throughout the City’s utility service area. Project services shall include, but may not be limited to, furnishing all labor and materials necessary for the installation and/or rehabilitation of service extensions of distribution and collection facilities generally involving stormwater, potable water, sewer, and reuse piping of twenty four (24) inches or less; storm inlets; gravity sewers; low pressure system piping; manhole liners; pump station and other related services including, but not limited to, general earth work and ancillary electrical work that provide water and/or wastewater services between individual properties and major transmission facilities. Contractors shall be required to provide proof of insurance, licenses and bonding capabilities as described in the RFQ documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Structures, Storm Drainage Manholes, Frames, and Covers.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents