Similar Projects
Regional Maintenance of Grease Trap Services for Hampton Roads Virginia AOR
Term Contract
Design

Regional Maintenance of Grease Trap Services for Hampton Roads Virginia AOR
Term Contract
Design

Riverwalk Trail - Park Avenue Extension
Infrastructure
Bidding
Danville, VA 24540

Replace Condenser Water Loop Piping
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Virginia Beach, VA

Replace Maintenance Holes 29,36,37 and 72 JBLE-Ft.Eustis
Post-Bid
$250,000 to $500,000 est. value
Fort Eustis, VA

Gate Valve and Reducing Nipple
Post-Bid
Norfolk, VA

Replace Potable Water Line
Results
Norfolk, VA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Maintain and Pump Grease Traps and Waste Barrels
Term Contract
Bidding
Chesapeake, Norfolk, Portsmouth, Virginia Beach, VA

Walkway Connector at Unionville Elementary School
Post-Bid
Unionville, VA 22567

Stormwater BMP Management IDQ FY21
Results
Less than $4,967,055 est. value
Norfolk, VA 23510

Pumping Services for Grease Traps
Infrastructure
Bidding
Virginia Beach, VA

Turnkey Stormwater Pipe Cleaning and CCTV Inspection and/or Stormwater Management Facilities (SWMF) Maintenance Services
Post-Bid
Virginia Beach, VA

River Oaks, Pump Station 44 Service Area, Phase 1, Water and Sewer Replacement
Results
$1,672,184 est. value
Norfolk, VA 23510

MCPSA Plum Creek-Bethel-Riner Water System Interconnection Project
Infrastructure
Bidding
VA

Last Updated 02/02/2022 11:24 AM
Project Title

Blue Ridge Farms Phase 4 - Water, Sanitary, Storm Sewer and Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Lynchburg, VA   (Lynchburg City County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the installation of approximately 5,600 LF of primarily 8” water main and appurtenances and approximately 300 LF of 6” water main and appurtenances; rehabilitation of approximately 5,300 LF of 8”, 10”, and 12” sanitary sewer and 21 manholes; replacement of approximately 690 LF of existing 8” and 10” sanitary sewer and 12 manholes with new sanitary sewer and manholes; rehabilitation of approximately 2,100 LF of storm sewer; replacement of approximately 1,600 LF of storm sewer with new storm sewer; construction of 1 regenerative stormwater outfall, installation of approximately 2,100 LF of new sidewalk, and 16,000 SY of pavement overlay with associated asphalt patch work. All work is within the Blue Ridge Farms subdivision, City right-of-way, and City obtained construction easements

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents