Similar Projects
NW 10th Street and Sunset Drive - Phase 1
Infrastructure
Conception
$500,000 CJ est. value
Waukee, IA 50263

NW 10th Street and Sunset Drive - Phase 2A
Infrastructure
Conception
$500,000 CJ est. value
Waukee, IA 50263

10th Street & Sunrise Dr Phs II A Improvements
Infrastructure
Design
$13,300,000 CJ est. value
Waukee, IA 50263

2022 HMA Alley Reconstruction Project
Infrastructure
Design
$57,000 CJ est. value
Clear Lake, IA 50428

Pavement Planing/Grooving - I-80
Infrastructure
Bidding
$2,500,000 CJ est. value
Adair, IA 50002

Ogden Maintenance Facility, Boone County Secondary Roads Division
New Construction, Infrastructure
Bidding
$750,000 CJ est. value
Ogden, IA 50212

Asphalt Alleys & Dead-End Street Resurfacing
Infrastructure
Post-Bid
$400,000 CJ est. value
Clinton, IA 52732

2022 Atkins PCC Street Repairs Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Atkins, IA 52206

2022 Road Program
Infrastructure
Results
$289,643 CJ est. value
Boone, IA 50036

RCB Culverts New-Single Box, HMA Resurfacing on Thunder Road Project
Infrastructure
Results
$1,844,360 CJ est. value
Guttenberg, IA 52052

Cedar Heights Drive Reconstruction - 111 - City of Cedar Falls
Infrastructure
Construction
$7,173,000 CJ est. value
Cedar Falls, IA 50613

South Grand Prairie Parkway - Grand Avenue to Raccoon River Drive - 0510 014 2021 - City of West Des Moines
Infrastructure
Construction
$8,500,000 CJ est. value
West Des Moines, IA 50261

Fog Seal
Infrastructure
Pending Verification
$549,553 CJ est. value
Tipton, IA 52772

Engineering Services Downtown Coon Rapids Streetscape
Infrastructure
Pending Verification
$220,000 CJ est. value
Coon Rapids, IA 50058

170th Street and Meredith Drive - TR19-02 - City of Urbandale
Infrastructure
Conception
$260,000 CJ est. value
Urbandale, IA 50263

Last Updated 09/30/2023 03:02 AM
Project Title

North Load Center 69 kV Switch Replacement

Physical Address View project details and contacts
City, State (County) Waverly, IA 50677   (Bremer County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Roadway Lighting
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The general nature of the work on which bids will be received consists of removal of existing 69 kV GOAB switches and replacement with new owner furnished 69 kV GOAB switches with associated equipment. The Work shall be performed at the North load Center located in Waverly, Iowa. Est. Completion Date: May 1, 2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing Question Deadline Sep 07, 2023

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents