Similar Projects
USAFA Fy22 Grease Laden Duct Cleaning Service
Term Contract
Post-Bid

Critical Campus Wide HVAC
Alteration
Post-Bid
$20,563 est. value
Denver, CO

J041--OCC-Data Center A/C Repairs Pop: 11-20-2020 To 11-19-2021
Results
Denver, CO

CU Denver PN20-112394 - SCPP Only
Alteration
Results
$125,000 est. value
Denver, CO 80204

Grant Ranch Chiller Replacement
Renovation
Construction
$500,000 CJ est. value
Littleton, CO 80123

Greenwood Chiller Replacement
Renovation
Construction
$300,000 CJ est. value
Denver, CO 80239

Clear Creek HVAC Remodel Project
Alteration
Post-Bid
Denver, CO 80204

HVAC Upgrades - Multiple Buildings
Term Contract
Results
CO

Replace HVAC System #49 Replace Water Soft #118
Alteration
Post-Bid

Annual Building Chiller Maintenance
Alteration
Results
Denver, CO 80203

Evie Dennis Heat Pump Replacement
Renovation
Post-Bid
$300,000 CJ est. value
Denver, CO 80249

Chiller Replacement, Building 959
Alteration
Results
CO

Air Duct Cleaning for Denver Fire Department
Term Contract
Post-Bid
Denver, CO 80206

Replace Cooling Unit in Elevator Room
Alteration
Results
Less than $50,000 est. value
Denver, CO 80203

Recreation Centers - HVAC Equipment Upgrades
Renovation
Post-Bid
$200,000 CJ est. value
Denver, CO 80202

Last Updated 01/11/2023 03:25 PM
Project Title

Corsican Apartments Boiler Replacement

Physical Address View project details and contacts
City, State (County) Denver, CO 80206   (Denver County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes a boiler replacement for the existing apartment complex. As of January 2023, the project documents are complete and the owner is awaiting building permit approvals from the City of Denver. General Contractor is unknown. Construction start is possible February 2023.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents