Similar Projects
Robert Road Improvements - City of Prescott Valley
Infrastructure
Conception
$500,000 CJ est. value
Prescott Valley, AZ 86314

Robert Road Improvements - City of Prescott Valley
Infrastructure
Conception
$500,000 CJ est. value
Prescott Valley, AZ 86314

Fire Drill Ground Improvements - 17001 - City of Prescott
Demolition, New Construction, Infrastructure
Design
$3,487,427 CJ est. value
Prescott, AZ 86303

Bell Rock Trail Water Storage Tank
New Construction, Infrastructure - 2,350 SF
Design
$2,000,000 CJ est. value
Sedona, AZ 86336

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Sedona Airport Infield RSA Drainage Improvements (Phase 1)
Infrastructure
Post-Bid
$850,699 CJ est. value
Sedona, AZ 86336

Starlight Drive Pedestrian and Drainage Improvement Project
Infrastructure
Results
$1,496,304 CJ est. value
Prescott Valley, AZ 86314

Starlight Drive Pedestrian and Drainage Improvement Project
Infrastructure
Results
$1,496,304 CJ est. value
Prescott Valley, AZ 86314

Unisource Energy Services
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Cottonwood, AZ 86326

San Cipriano Apartments
New Construction, Infrastructure
Pending Verification
$17,000,000 CJ est. value
Cottonwood, AZ 86326

East Cherry Street Warehouse
New Construction, Infrastructure - 12,600 SF
Pending Verification
$1,000,000 CJ est. value
Cottonwood, AZ 86326

Concession Stand - Posse Grounds Park - PR-01 - City of Sedona
New Construction, Infrastructure
Conception
$559,000 CJ est. value
Sedona, AZ 86336

SundogTrunk Main, Phase C - City of Prescott
Infrastructure
Design
$8,210,957 CJ est. value
Prescott, AZ 86301

Community Resource Building Walkway and Service Access Drive Addition
Infrastructure
Post-Bid
Prescott, AZ

Drainage Improvements
Infrastructure
Results
Jerome, AZ 86331

Last Updated 03/28/2023 09:38 AM
Project Title

Chick Pond Erosion Mitigation Project

Physical Address View project details and contacts
City, State (County) Cornville, AZ 86325   (Yavapai County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $218,844 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project includes furnishing all labor, materials, equipment, services, utility coordination and transportation required for constructing a series of gabion inlet structure and sediment haul off and all related improvements in the Cornville area of Yavapai County; all in accordance with the plans, specifications and contract documents. Any questions or concerns about the project should be submitted in writing a minimum of 72 hours prior to the bid opening and will be answered on-line. The Board of Directors of the Yavapai County Flood Control District reserves the right to reject any or all bids, to waive formalities, and to accept the bid deemed to be in the best interest of the Yavapai County Flood Control District.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents