Similar Projects
On-Call Stormwater Construction
Infrastructure
Bidding
Colorado Springs, CO

2021 Storm Sewer Hydro Cleaning and Video Inspection
Infrastructure
Bidding
Evans, CO

Stormwater Facility Maintenance
Post-Bid
Canon City, CO

2020 Sikis Subdivision Sewer Replacement Project Phase II
Post-Bid
Cortez, CO 81321

2020 Cherrymoor South Interceptor Rehabilitation
Results
Cherry Hills Village, CO 80113

Tollgate and Sand Creek Interceptor Diversion Structures Rehabilitation Phase 2
Results
$3,210,000 to $3,370,500 est. value
Aurora, CO 80012

HP Storm Pipe
Infrastructure
Bidding
Fort Collins, CO 80521

Arvada and Franktown Permanent Water Quality Structure Installation
Post-Bid
$54,000 est. value
Arvada, CO 80007

Pipe Lining Projects
Results
Colorado Springs, CO 80903

ACGC Weir Improvements
Post-Bid
Peyton, CO

Grease Interceptors Maintenance Service
Term Contract
Results
Less than $184,760 est. value
Sterling, CO

Rabbit Ears Pass Storm Water Improvement
Post-Bid
Less than $430,000 est. value
CO

Construction Management Services for Storm Water Improvements and Roadway Repair
Term Contract
Results
Lyons, CO 80540

Phase 2 - Storm Sewer - Lake
Post-Bid
Wheat Ridge, CO

NE Campus Storm Water Mitigation
Results
Gunnison, CO 81231

Last Updated 07/30/2021 05:08 PM
Project Title

2021 Preventative and Critical Lining

Physical Address View project details and contacts
City, State (County) Denver, CO   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,600,000 to $4,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project is to rehabilitate approximately 110,00 linear feet of deteriorated sewer pipes in the City and County of Denver using Cured in Place Pipe (CIPP) technology. The rehabilitation of pipelines shall be done by the installation of a resin-impregnated flexible tube which, when cured, shall be continuous and tight-fitting throughout the entire length of the original pipe. The CIPP shall extend the full length of the original pipe and provide a structurally sound, jointless and water-tight new pipe-within-a-pipe. The Contractor is responsible for proper, accurate and complete installation of the CIPP using the system selected by the contractor meeting the City’s requirements. Most of the work will be located in council districts 3 and 8, with minor work in districts 1, 7 and 9.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents