Similar Projects
Project Luna
New Construction
Conception
$33,000,000 est. value
Forney, TX 75126

Storage Building
New Construction
Conception
Copperas Cove, TX 76522

Amazon E-Commerce Distribution Center
New Construction - 1,080,034 SF
Design
$90,000,000 to $100,000,000 est. value
Amarillo, TX

Lovett Industrial - Alliance
Build-Out - 646,000 SF
Design
$800,000 est. value
Fort Worth, TX 76177

Hunter Ferrell Industrial
New Construction - 210,476 SF
Bidding
$10,000,000 CJ est. value
Grand Prairie, TX 75050

McKinney Industrial Business Park
New Construction
Post-Bid
Fairview, TX

Intermodal Logistics Center Building 6 - Structural Steel Package
New Construction
Post-Bid
Fort Worth, TX

Perot Industrial Park Phase I
New Construction
Construction
$10,000,000 CJ est. value
Irving, TX 75038

Dalfen Industrial Building
New Construction - 240,000 SF
Construction
$10,000,000 est. value
Dallas, TX 75062

Velocity
New Construction - 3,795,000 SF
Pending Verification
$10,000,000 CJ est. value
Austin, TX 78617

Plano Tech Center 2
New Construction - 122,098 SF
Pending Verification
$10,000,000 CJ est. value
Plano, TX 75074

West Texas A&M New Central Supply and Warehouse Construction
New Construction
Conception
Canyon, TX 79016

Georgetown Logistics Park
New Construction - 625,000 SF
Design
Georgetown, TX 78628

Industrial Warehouse & Distribution Facility
New Construction - 305,760 SF
Post-Bid
$10,000,000 CJ est. value
Selma, TX 78154

FedEx Freight
New Construction - 148,168 SF
Construction
$23,080,435 est. value
Laredo, TX 78040

Reported 06/15/2022 11:06 AM
Project Title

Premier Flex Ponder - Building 9

Physical Address View project details and contacts
City, State (County) Ponder, TX 76259   (Denton County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected July 2022, Construction Completion Expected September 2022
Bids Due View project details and contacts
Estimated Value $890,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 14, 2022, the project has been registered with the Texas Department of Licensing and Regulation. No building permits have been submitted into the County Denton. Information regarding the architect and general contractor has not been disclosed. Construction is anticipated to begin July 2022 and completed by September 2022. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Industrial Warehouse, Approximately 5,500 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents