Similar Projects
Georgia 400
New Construction, Infrastructure - 907,550 SF
Conception
$90,000,000 CJ est. value
Cumming, GA 30040

Blastec - Site Only
Renovation
Design
Cumming, GA 30041

Brackley Residences
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Cumming, GA 30040

Highway 369 Water Line GDOT Relocation
Infrastructure
Bidding
$567,627 CJ est. value
Cumming, GA 30041

Highway 369 Water Line GDOT Relocation
Infrastructure
Bidding
$567,627 CJ est. value
Cumming, GA 30041

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

FY 2021 Water Main Improvements
Infrastructure
Post-Bid
Gainesville, GA

Bentley Road and Derby Drive Water Line Extensions
Results
GA 30040

Buford Dam Road 12-Inch Water Line Improvements
Results
Cumming, GA

Harbour Point Entrance
New Construction, Demolition
Construction
Gainesville, GA

Forsyth County Mixed-Use Development
New Construction, Infrastructure - 63,650 SF
Pending Verification
$320,000,000 CJ est. value
Cumming, GA 30040

Resurfacing and Restriping of the Public Safety Complex
Infrastructure
Bidding
$500,000 CJ est. value
Cumming, GA 30028

2022 Cumming Utilities Overhead Power Line Removal and Underground Replacement Project
Infrastructure
Post-Bid
$500,000 CJ est. value
Cumming, GA 30040

Pilgrim Mill Road and Young Deer Drive Water System Improvements
Results
Cumming, GA 30128

580 Peachtree Parkway / Cumming
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Cumming, GA 30041

Last Updated 08/30/2022 07:34 AM
Project Title

2022 Sewer Improvements

Physical Address View project details and contacts
City, State (County) Cumming, GA 30040   (Forsyth County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $389,530 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The overall project is comprised of four individual projects. The Owner will only award a single contract to one contractor for all four projects: Orchards of Central Park Gravity Sewer, Veterans Memorial Sewer Improvements, Highway 9 Sewer Relocation, and Dahlonega Highway Sewer Extension. The last day for submission of questions shall be Friday, August 19, 2022. Contractor questions should be directed to Tiffany Barry in writing at tiffany@cecincga.com. For all further requirements regarding proposal submittal, qualifications, procedures, and contract award, refer to the Instructions to Proposers that are included in the Proposal Documents.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents