Last Updated | 08/04/2022 11:05 AM |
Project Title | Demolition and Site Clearance |
Physical Address | View project details and contacts |
City, State (County) | Muskegon, MI 49442 (Muskegon County) |
Category(s) | Heavy and Highway, Residential, Single Trades |
Sub-Category(s) | Environmental, Single-Family Homes, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For the following demolition and site clearance project: All structures located at: PDF: 275 Myrtle Ave. Muskegon. The project consists of demolishing all structures on the site(s), removing the debris to a licensed landfill and filling excavations in accordance with contract documents and city ordinance. This is to include the removal of any shrubbery/bushes/fencing/asbestos on the property. Please refer to the City's website to view the ad and any additional requirements/information that are not in the ad. All forms within the bid documents of the City's Demolition Proposal/Contract must also be submitted. Bid proposals should be placed inside a 9" x 12"envelope addressed to the City of Muskegon with the title "Demolition Bid" and the address of the site(s) on the outside of the envelope. Bidder's name, address and phone number must be clearly marked on the outside of the envelope. You may bid on any one or all of the listed structures. Hiring goals and percentages are set forth in the Contract Documents. No bid may be withdrawn within 60 days after the bid opening. All work must be completed within 30 days of the issuance of the Notice to Proceed (the only exception must be approved by the City and the Contractor). The City of Muskegon reserves the right to reject any or all bids, or to waive any informalities or irregularities in the bidding. Before starting demolition, the contractor shall check to determine that all utility services are disconnected at the service mains in accordance with the rules and regulations governing the utility involved. No work shall commence on any building before utilities are properly disconnected. Sanitary sewer and water lines leading from the structure(s) to be demolished shall be securely sealed by the contractor as determined by the City. All active utility mains traversing the site shall be preserved. Structures shall be demolished in such manner as to avoid hazards to persons and property, interference with the use of adjacent buildings, and interruption of free passage to and from such buildings. A suitable fence shall be erected around the work site. Demolition work shall be kept thoroughly wetted down to prevent the spread of dust. Contractor shall provide water and necessary connections therefor. All structures in the demolition area shall be completely razed and all materials shall become the property of the contractor and be removed from the site. Razina shall include, but is not limited to, all items such as posts, piers, fences, walls (including basement and foundation walls), sheds, steps, thresholds, except such items as are specifically noted by the City to remain in place. The contractor shall also be CITY OF MUSKEGON INSPECTION SERVICES DEPARTMENT 1. required to remove such construction at grade as walks, driveways or other area pavements. Wood partitions, stairways, furnaces, piping and other equipment, as well as rubbish and debris located in basements or cellars shall be removed from the site. In buildings without basements and the ground floor is of wood construction, the flooring joists and/or sleepers shall be removed. In such buildings where the ground floor is other than wood and has space under the floor, the floor shall be removed. All basement floors or other paving below grade shall be removed from the site. Masonry walls shall be demolished in small sections, structural steel, case iron and heavy timber framing members shall be removed individually and carefully lowered. Explosives shall not be used in the work except by prior written permission of the City. All debris shall be disposed of in accordance with all applicable statutes, ordinances and regulations of the State of Michigan and City of Muskegon or any other municipality in which said debris is disposed |
||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |