Similar Projects
Rocky Mountain Metropolitan Airport Taxiway Reconstruction - Jefferson County
Infrastructure
Conception
$3,053,510 est. value
Broomfield, CO 80021

Murphy Express #8904 / Arvada
New Construction, Infrastructure - 2,800 SF
Design
$1,500,000 CJ est. value
Arvada, CO 80002

Pavement Overlay and Construction of Sedimentation Ponds for County Road 170
Infrastructure
Design
$200,000 CJ est. value
Evergreen, CO 80439

Golden Gate Canyon SP - Vault Toilet Replacement
Demolition, New Construction, Infrastructure
Bidding
$250,000 CJ est. value
Golden, CO 80403

RFP D/B - Progressive Design-build for Van Bibber Trail and Crossings
Infrastructure
Bidding
$500,000 CJ est. value
Arvada, CO 80403

Golden DDA Sidewalk and Alley Power Washing
Post-Bid
Golden, CO

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Prequalification Water Line Replacements
Term Contract
Results
Arvada, CO

Murphy Express #8855 / Littleton - Rebid
New Construction, Infrastructure - 2,824 SF
Construction
$1,500,000 CJ est. value
Littleton, CO 80127

The Lock at Flatiron
New Construction, Infrastructure - 1,425 SF
Construction
$20,000,000 CJ est. value
Broomfield, CO 80021

Rainbow Hill Road Hotel and Commercial
Demolition, New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Evergreen, CO 80439

17200 Colfax Avenue Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Golden, CO 80401

Slater Elementary School Renovations - 2018 Bond - Jefferson County Public Schools
Infrastructure, Renovation
Design
$1,311,000 CJ est. value
Lakewood, CO 80215

Scour Mitigation of Clear Creek Structures
Infrastructure
Bidding
$5,000,000 CJ est. value
Morrison, CO 80465

Last Updated 08/31/2022 12:32 PM
Project Title

Ward TOD Streets/ Intersections

Physical Address View project details and contacts
City, State (County) Wheat Ridge, CO 80033   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, equipment and materials to reconstruct W 52nd Avenue between Ward Road and Tabor Street including the intersection of Ward Road and W 52nd Avenue and a water line replacement, Tabor Street between W 52nd Avenue and Ridge Road, and Ridge Road east of Tabor Street, and the east leg of the intersection of Ward Road and Ridge Road near the Wheat Ridge . Ward Station. General Requirements - Insurance Required Question Acceptance Deadline 08/22/2022 04:00 PM EDT Questions are submitted online Yes

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents