Similar Projects
South Aspen Avenue Mixed Use Project Development
New Construction, Infrastructure - 260,000 SF
Conception
$132,000,000 CJ est. value
Broken Arrow, OK 74011

Proposition 4 - Tulsa Public Schools
Renovation
Conception
$90,695,000 CJ est. value
Tulsa, OK 74103

Pavement Rehabilitation
Infrastructure
Design
$22,434,951 CJ est. value
Tulsa, OK 74110

Grade, Drain and Surface
Infrastructure
Design
$10,287,547 CJ est. value
Sand Springs, OK 74063

Tulsa County Sheriff's Office (TCSO) Headquarters Sanitary Sewer
Infrastructure
Bidding
$600,000 CJ est. value
Tulsa, OK 74117

Mass Notification System
Infrastructure
Bidding
$90,000 CJ est. value
Broken Arrow, OK 74012

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

Interior Construction Remodel
Renovation
Post-Bid
Sand Springs, OK

New Greenhouse/Hoop House - Union Public Schools
New Construction
Results
$207,446 est. value
Tulsa, OK 74146

District Wide Building-Automation Systems Upgrades
Renovation
Results
$300,000 est. value
Tulsa, OK 74103

The Learning Experience
New Construction
Construction
Broken Arrow, OK 74012

AEP Laydown Yard Expansion Project
Infrastructure - 424,274 SF
Construction
$38,982,295 CJ est. value
Tulsa, OK 74108

South Elementary School
New Construction, Addition
Pending Verification
Tulsa, OK 74107

North Elementary School
Renovation
Pending Verification
Bixby, OK 74008

LaFortune Park Splash Pad - Tulsa County
Infrastructure
Conception
$550,000 CJ est. value
Tulsa, OK 74135

Last Updated 09/22/2022 02:29 PM
Project Title

Evergreen Baptist Church Phase 4

Physical Address View project details and contacts
City, State (County) Bixby, OK 74008   (Tulsa County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $8,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The work is generally described as follows: New 55,000-sqare foot, two-story PEMB addition with CMU storm shelter. Anticipated Notice to Proceed: October 10, 2022. Contract Duration: 410 calendar days. Alternates include asphalt paved parking addition, elevator and PEMB canopies. Please contact Hutton Lowry with Lowry Construction Services, Inc. at hutton@lowrycs.com or (918) 592-2442 with any questions regarding bid procedures or documents. All Bidders are required to meet all qualification requirements as established in the Contract Documents. Upon receipt of an acceptable bid, the contract will be awarded within thirty (30) days after opening bids and the written contract executed within sixty (60) days thereafter. The Owner reserves the right to reject any and all bids or to waive any formalities or irregularities in the bid.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents