Similar Projects
Demolish Multiple Buildings
Demolition
Post-Bid
$500,000 to $1,000,000 est. value
Marion, IN

Broadway Corridor Demolition
Demolition
Post-Bid
Gary, IN 46400

Demolition
Demolition
Results
$1,000,000 to $5,000,000 est. value
Porter, IN 46304

Deep River Rock Riffle Improvements
Renovation
Results
Lake Station, IN 46405

Henry County Sheriff Office and Detention Center Demolition
Post-Bid
New Castle, IN 47362

Blight Elimination Program (BEP) Demolition
Results
Richmond, IN 47374

Hardest Hit Demolition of Unsafe Structures Phase I
Demolition
Post-Bid
East Chicago, IN 46312

Blight Clearance
Results
Flora, IN 46929

2020 Board of Safety Demolition of Unsafe Structures
Demolition
Post-Bid
East Chicago, IN 46312

Demolition, Remove Buildings
Demolition
Results
IN

Double Track Demolition
Demolition
Post-Bid
Beverly Shores, Chesterton, Long Beach, Michigan City, IN

Jail II Building Smokestack Removal
Results
Indianapolis, IN 46204

TICE Building Demolition
Demolition
Post-Bid
Columbia City, IN 46725

Building Demolition
Demolition
Results
Lebanon, IN 46052

Bridge Replacement
New Construction, Demolition
Post-Bid
Madison, IN 47250

Last Updated 11/03/2020 03:05 PM
Project Title

Demolition and Site Clearing

Physical Address View project details and contacts
City, State (County) Hammond, IN 46320   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of existing structure, including foundations, garages, outbuildings (unless specifically excluded) dead trees, and removal and disposal of all debris, all basement floor areas shall be removed, all sewers shall be plugged at the first hub inside the property line, and all water lines shall be tied off and capped on the property side of the buffalo box. Said removal of buildings, equipment and material shall be cleared off within five days from the date of the issuance of the demolition permit. Filling in of the property shall be done by filling in the excavation with clean sand only and topping the excavation with four inches of black soil and seeding the same with a suitable grass seed or sod.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents