Similar Projects
NM Game and Fish Infrastructure Improvements on Bernardo WMA Wetland Complex
Renovation, Infrastructure
Bidding
$7,022,000 est. value
Bosque, NM 87006

Underground Concrete Utility Vaults
Results
Less than $50,000 est. value
Farmington, NM

Lincoln National Forest Gravel Pits
Term Contract
Results
Sacramento, NM 88347

Daniel Fernandez Youth Center - Phase IV Addition
Addition - 19,642 SF
Post-Bid
Los Lunas, NM 87031

Primrose School of Northwest Albuquerque
New Construction
Design
Albuquerque, NM 87120

Hydro Excavation, Multi-Term Contract
Term Contract, Infrastructure
Results
Farmington, NM

Calabacillas Grade Control Structure (GCS) 2 Extension
Infrastructure
Post-Bid
$545,000 est. value
Albuquerque, NM 87114

Excavation and Dirt Work
Infrastructure
Results
NM

Voluntary Public Access- Habitat Initiative
Infrastructure
Post-Bid
Santa Fe, NM 87506

San Pedro Mine Safeguard Project - Phase III
Results
Santa Fe, NM 87505

Hydro Excavation, Multi-Term Contract
Infrastructure
Results
Farmington, NM

Canon Community Ditch Association - Phase II Acequia Improvements Project
New Construction
Results
$250,000 est. value
Canones, NM

Last Updated 04/21/2022 06:11 PM
Project Title

Bergin Substation Rebuild - Civil Work

Physical Address View project details and contacts
City, State (County) Farmington, NM   (San Juan County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $660,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract shall consist of furnishing all labor, equipment, and materials for Civil work for the expansion at the Bergin Substation, to include grading, earthwork, slope stabilization, 133 lf of 24" storm pipe, concrete headwalls, 441 ft of open drainage channels, 91 lf of concrete diversion dike, and new fencing enclosure with vehicle gates and panic gates. All civil work to be performed outside of the existing energized substation.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents