Similar Projects
Comprehensive Infrastructure for Tampa's Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Ballast Point Pump Station Force Main Extension
Renovation, Infrastructure
Bidding
Tampa, FL

Low Pressure Sewer System (LPSS) SCADA Equipment Installation and Monitoring
Infrastructure
Bidding
$3,631,800 est. value
FL

Water and Sewer Materials
Infrastructure
Post-Bid
$4,500,000 est. value
Tampa, FL

Wastewater Collection System Repair - FY21
Term Contract
Results
Less than $2,500,000 est. value
Tampa, FL 33602

Utility Locator Service (Underground)
Term Contract
Results
Tampa, FL 33601

Park Gravity Sewer Replacement
Infrastructure
Bidding
$861,391 est. value
Tampa, FL

Vacuum and High Pressure Jetting Truck Services for the Wastewater Department
Term Contract
Results
Tampa, FL 33605

Vacuum and Jet Vacuum Truck Services
Term Contract
Results
Tampa, FL

Sewer and Clean Waterline Construction, Babe Zaharias Golf Course
Results
Tampa, FL 33612

Wastewater Gravity Sewer Rehabilitation by Cured in Place Pipe (CIPP) - FY21
Results
$1,500,000 est. value
Tampa, FL

FY 21 Pipeline Rehabilitation
Results
$3,045,000 est. value
Tampa, FL

Ridgewood Wastewater Collection System Rehabilitation by CIPP Lining
Results
Tampa, FL

PVC Sewer Pipe (Sheltered Market Solicitation)
Results
Tampa, FL

Solid Core Sewer Bricks (Made From Clay or Shale) (Sheltered Market Solicitation)
Infrastructure
Results
Tampa, FL

Last Updated 03/10/2022 10:54 AM
Project Title

Large Gravity Sewer Cleaning - West River North Interceptor

Physical Address View project details and contacts
City, State (County) Tampa, FL   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

5.0% - BBE/MBE and SLBE subcontracting goal. To provide all labor, materials and equipment necessary for the completion of the work detailed on the plans (Attachment 1) and herein. This work includes the preliminary sonar/CCTV inspection of 2,495 feet of 36-inch diameter pipe, cleaning of up to 11,079 feet of 42-inch diameter pipe, cleaning of up to 2,495 feet of 36-inch diameter pipe and the subsequent underwater sonar and closed-circuit TV inspection of all pipe that has been cleaned on this project. The Work also includes hauling, testing and disposal of debris removed from pipelines.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents