Similar Projects
East Master Lift Station Design
Renovation, Infrastructure
Bidding
$4,700,000 CJ est. value
Port Orange, FL 32127

Bike Lane/Sidewalk/Milling and Resurfacing/Lighting/Traffic Signals/Drainage Improvements
Infrastructure
Bidding
$7,266,828 CJ est. value
Jacksonville, FL 32205

Plumbing Supplies
Term Contract
Sub-Bidding
Jacksonville, FL 32202

Plumbing Contractor - Annual Contract
Term Contract
Sub-Bidding
Port Charlotte, FL 33952

Oak Park Plumbing Repairs and Inspection
Post-Bid
Gainesville, FL

Plumbing Contractors
Term Contract
Post-Bid
FL

On-Call General Plumbing, Backflow and Emergency Services
Term Contract
Results
Fort Myers, FL

Valve Exercise and Unidirectional Flushing
Term Contract
Results
$1,800,000 est. value
FL

11th Drive and 37th Street Roadway and Intersection Improvements
Infrastructure
Bidding
$2,947,509 CJ est. value
Fellsmere, FL 32966

Moyno Pump
Term Contract
Sub-Bidding
Miramar, FL 33025

Plumbing : Repairs, Maintenance and Emergency Services
Alteration
Post-Bid
Fort Pierce, FL

Sources Sought - GSA, Region 4, Tampa, Design-Build Closed Loop Side Stream Filtration System, Water Source ACS and Piping Replacement
Results
$250,000 to $500,000 est. value
Tampa, FL

Construction of the Orange City Main Water Plant Greensand Filter
Renovation, Infrastructure
Bidding
$1,500,000 CJ est. value
Orange City, FL 32763

Justice Center Tower Plumbing Replacement
Renovation
Post-Bid
Fort Myers, FL 33901

Plumbing Services
Results
Sebring, FL

Last Updated 11/15/2022 01:07 PM
Project Title

Pressure Pipe, Insert Valve and Line Stop Repair and Installation

Physical Address View project details and contacts
City, State (County) Boca Raton, FL 33431   (Palm Beach County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the furnishing of all labor, materials, equipment, services and incidentals for the on-going rehabilitation, repairs and replacement services to the City's water distribution system, installation of insert valves, installation of line stops, and all incidentals required to complete the project in conformance with the Contract Documents. The work is located throughout the City of Boca Raton's utility service area. This bid is intended to be a continuing term contract for Work in the following groups: Group A: Pressure Pipe Repair and Installation, Group B: Insert valve Installation and Group C: Line Stop Installations. The term contract will be a five (5) year continuing contract, with three (3) one-year renewals for on-going repairs and rehabilitation services to the City's pressure mains. The City will issue a separate Work Order for each individual project, on an as needed basis.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents