Similar Projects
Rehabilitation/Repair of Water Control Structures A-22, A-24 and one (1) BSL-2, Twin Culverts at the A-2 Pond
Infrastructure
Bidding
$1,600,000 est. value
Port Saint Lucie, FL

Coastal Storm Risk Management Project South Hutchinson Island Initial Construction 2021 St. Lucie County, Florida
Term Contract
Bidding
$10,000,000 to $15,000,000 est. value
FL

Portofino Shores Lake Bank Restoration
Post-Bid
$484,650 to $530,510 est. value
Fort Pierce, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Ten Mile Creek Oxbow Restoration
Results
Fort Pierce, FL

McCarty Ranch Extension Water Quality Restoration Construction Project - Area 3
Results
Less than $2,000,000 est. value
Port Saint Lucie, FL 34984

Drainage / Road Right-of-Way General Maintenance and Guardrail Public Works/Road and Bridge
Infrastructure
Bidding
Fort Pierce, FL 34982

Metal Culverts
Infrastructure
Post-Bid
Port Saint Lucie, FL

Park and Ride Lots
Results
Less than $2,718,616 est. value
FL

Drainage - Treasure Coast Counties Drainage - Routine Maintenance
Infrastructure
Bidding
$500,000 est. value

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Drainage Repairs and Improvements
Results
Less than $200,000 est. value

Fabricate and Install Aluminum Hinged Drainage Grate
Infrastructure
Bidding
Port Saint Lucie, FL

Swale Liner Maintenance - Service Area A
Infrastructure
Post-Bid
Port Saint Lucie, FL

Emergency Dune Restoration and Miscellaneous Beach Services
Term Contract
Results
Fort Pierce, FL 34982

Last Updated 08/17/2021 02:41 PM
Project Title

McCarty Ranch Extension Water Quality Restoration Project for Area 4

Physical Address View project details and contacts
City, State (County) FL 34987   (Saint Lucie County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide all of the labor, supervision, equipment, machinery, tools, materials, permits, transportation, utilities, and other incidentals required to complete the construction of a 286.95-acre water farm at the McCarty Ranch Extension. It is the general intent that the Contractor shall excavate all quantities for the construction of proposed seepage canals and perimeter berm. Areas will be cleared for excavation and placement of material to be used for the construction of a seven-foot tall above ground impoundment that will retain water that is pumped in from the proposed pump station. Additionally, the Contractor shall be required to construct three emergency overflow connections, consisting of FDOT Type “H” Ditch Bottom Inlets with 36” and 48’’ Corrugated Aluminum Pipe (CAP). The Contractor shall be responsible for the construction of the supply lines to the intake pump and for the discharge lines into the reservoir. The Contractor shall dewater them excavations to provide a dry condition during excavation and account for site drainage management during the dewatering operation

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents