Similar Projects
Bridge Repair - FRA-US 270-06.17
New Construction, Infrastructure
Bidding
OH

Bridge Repair - US 23-0.25 L and R
Results
OH

Olentangy Trail - Arena District Connector Bridge
Results
Columbus, OH 43205

Schiller Park Pedestrian Bridge Repair
Results
Columbus, OH 43206

Bridge Cleaning and Sealing 2020
Results
Columbus, OH

Bridge Rehabiltation - Lehman Road Bridge Replacement
Results
Columbus, OH

Bridge Repair - D06 Bridge Repair FY21
Results

Muirfield Drive at Brand Road Bridge Replacement
Renovation
Results
$1,300,000 est. value
Dublin, OH

Three Quarry Trails Metro Park Pedestrian Bridges
New Construction
Results
$268,739 est. value
Columbus, OH 43228

Bridge Replacement (1 Bridge) - Etna St / Elbern Ave Pt 1 and Pt 2
New Construction
Results
Whitehall, OH 43213

Quarry Trails Metro Park Pedestrian Bridges Installation Package
New Construction
Results
$320,000 est. value
Westerville, OH 43081

Bridge Deck Sealer
New Construction, Term Contract
Results

Combined Schleppi Road Drainage Improvement and Schleppi Road Bridge Replacement
Infrastructure
Results
$580,190 est. value
OH

Improvement of Olentangy River
New Construction, Infrastructure
Results
$1,409,587 est. value
OH

OPWC : Bethel-New Hope Bridge
New Construction
Results
Columbus, OH 43215

Last Updated 01/07/2022 09:17 AM
Project Title

Improvement of Agler Road over Alum Creek

Physical Address View project details and contacts
City, State (County) Columbus, OH 43227   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,574,722
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvement of 1,364 feet of Agler Road by rehabilitating an existing bridge over Alum Creek and reducing lane widths to construct a new 10 foot shared use path along the south side of the roadway. Construct a new shared use path connection between Agler Road and the Alum Creek Multi-Use Trail (Ohio to Erie Trail).

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents